13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

69Dy.Ex. Engr.or placed beyond the reach of measurement any workwithout the consent in writing of the Engineer-in-charge orhis subordinate in charge of the work, and if any work shallbe covered up or place beyond the reach of measurement,without such notice having been given or consent obtainedthe same shall be uncovered at the Contractor’s expense,and in default thereof no payment or allowance shall bemade for such work or for the materials with which the samewas executed..Contractor liable fordamage done andfor imperfections.Clause 20- If during the period of 24 Months from the dateof completion as certified by the Engineer-in-chargepursuant to clause 7 of the contractor or 36 months (Thirtysix Months) after commissioning the work, whichever isearlier in the opinion of the Executive Engineer the said workis defective in any manner whatsoever the Contractor shallforthwith on receipt of notice in that behalf from the ExecutiveEngineer, duly commence execution in every respect all thework that may be necessary for rectifying and setting rightthe defects specified therein including dismantling andreconstruction of unsafe portions strictly in accordance withand in the manner prescribed and under the supervision ofthe Executive Engineer. In the event of the Contractor failingor neglecting to commence execution of the saidrectification work within the period prescribed therefore inthe said notice and/or to complete the same as aforesaid asrequired by the said notice, the Executive Engineer may getthe same executed and carried out departmentally or by anyother agency at the risk, on account and at the cost of theContractor. The Contractor shall forthwith on demand pay tothe Government the amount of such cost, charges andexpenses sustained or incurred by the Government of whichthe certificate of the Executive Engineer shall be final andbinding on the Contractor. Such costs, charges andexpenses shall be deemed to be arrears of land revenueand in the event of the Contractor failing or neglecting to paythe same on demand as aforesaid without prejudice to anyother rights and remedies of the Government the same maybe recovered from the Contractor as arrears of land revenue.The Government shall also be entitled to deduct the samefrom any amount which may then be payable or which maytherefore become payable by the Government to theContractor either in respect of the said work or any otherwork whatsoever or from the amount of security depositretained by Government.Signature of Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!