13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

68Dy.Ex. Engr.P.W.D. ResolutionNo. CAT-1087/CR-94/Bldg.-2 Dated14/6/89.Work to be open toinspectionContractorresponsibleto be present.oragentinferior quality, or that any materials or articles provided byhim for the execution of the work are unsound or of a qualityinferior to that contracted for, or are otherwise not inaccordance with the contract, it shall be lawful for theEngineer-in-charge to intimate this fact in writing to theContractor and then notwithstanding the fact that the work,materials or articles complained of my have beeninadvertently passed certified and paid for, the Contractorshall be bound forthwith to rectify, or remove andreconstruct the work so specified in whole or in part, as thecase may require or if so required shall remove the materialsor articles at his own charge and cost and in the event ofhis failing to do so within a period to be specified by theEngineer – in – charge in the written intimation aforesaid, theContractor shall be liable to pay compensation at the rate ofone percent on the amount of the estimate for everyday notexceeding 10 days during which the failure so continuesand in the case of any such failure the Engineer-in-chargemay rectify or remove and re-execute the work or remove,and replace the materials or articles complained of as thecase may be at the risk and expense in all respects of theContractor. Should the Engineer –in-charge consider thatany such inferior work or materials as prescribed above maybe accepted or made use of, it shall be within his discretionto accept the same at such reduced rates as he may fixtherefor.Clause 18- All works under or in course of execution orexecuted in pursuance of the contract shall at all times beopen to inspection and supervision of the Engineer-inchargeand his subordinates, and the Contractor shall at alltimes during the usual working hours, and at all other timesat which reasonable notice of the intention of the Engineerin-chargeand his subordinate to visit the works shall havebeen given to the Contractor, either himself be present toreceive orders and instructions, or have a responsible agentduly accredited in writing present for that purpose. Ordersgiven to the Contractors duly authorized agent shall beconsidered to have the same force and effect as if they hadbeen given to the Contractor himself..Notice to be givenbefore work iscovered upClause 19 - The contractor shall give not less than fiveday’s notice in writing to the Engineer-in –charge or hissubordinate in charge of the work before covering up orotherwise placing beyond the reach of measurement anywork in order that the same may be measured and correctdimensions thereof taken before the same is so covered upSignature of Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!