13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

65Dy.Ex.Engr.or incur any expenditure in regard thereto before the ratesshall have been determined as lastly hereinbeforementioned, then in such case he shall only be entitled to bepaid in respect of the work carried out or expenditureincurred by him prior to the date of the determination of therate as aforesaid according to such rate or rates as shall befixed by the Engineer-in-charge. In the event of a dispute thedecision of the Superintending Engineer of the Circle will befinal. Where, however, the work is to be executed accordingto the designs, drawings and specifications recommended bythe Contractor and accepted by the Competent Authoritythe alterations above referred to shall be within the scope ofsuch designs, drawings and specifications appended to thetender.Extension of time inconsequence ofaddition oralterations.The time limit for the completion of the work shall beextended in the proportion that the increase in its costoccasioned by alterations or additions bears to the cost ofthe original contract work, and the certificate of theEngineer-in-charge as to such proportion shall beconclusive.No claim to anypaymentorcompensation foralteration in orrestriction of work.Clause 15- (1) If at any time after the execution of thecontract documents the Engineer-in-charge shall for anyreason whatsoever ( other than default on the pat of theContractor for which the Government is entitled to rescindedthe contract ) desire that the whole or any part of the workspecified in the tender should be suspended for any period orthat the whole or part of the work should not be carried outat all, he shall give to the Contractor a notice in writing ofsuch desire and upon the receipt of such notice theContractor shall forthwith suspend or stop the work wholly orin part as required, after having due regard to theappropriate stage at which the work should be stopped orsuspended so as not to cause any damage or injury to thework already done or endanger the safety thereof providedthat the decision of the Engineer as to the stage at which thework or any part of it could be or could have been safelystopped or suspended shall be final and conclusive againstthe Contractor. The Contractor shall have no claim to anypayment or compensation whatsoever by reason of or inpursuance of any notice as aforesaid, on account of anysuspension, stoppage or curtailment except to the extentspecified hereinafter.2. Where the total suspension of work ordered asaforesaid continued of a continuous period exceeding 90days the Contractor shall be at liberty to withdraw from thecontractual obligations under the contract so far as it pertainsSignature of the Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!