13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

64Dy.Ex.Engr.Works to beexecuted inaccordance withspecifications,drawings, ordersetc.Clause 13- The Contractor shall execute the whole andevery part of in the most substantial and workmanlikemanner, and both as regards materials and every otherrespect in strict accordance with specifications. Thecontractor shall also confirm exactly, fully and faithfully to thedesigns , drawings and instructions in writing relating to thework signed by the Engineer- in – charge and lodged in hisoffice and to which the Contractor shall be entitled to haveaccess for the purpose of inspection at such office, or on thesite of the work during office hours. The contractor will beentitled to receive three sets, of contract drawing and workingdrawings as well as one certified copy of the accepted tenderalong with the work order free of cost. Further copies of thecontract drawings and working drawing if required by him,shall be supplied at the rates Rs. 300/- per set of contractdrawing and Rs.200/- per working drawing except whereotherwise specified.AlterationIn specification anddesigns not toinvalidate contracts.Rates for works notentered in estimateor schedule of rateof the district.Clause 14 – The Engineer-in-charge shall have power tomake any alterations in or additions to the originalspecifications, drawings, designs, and instructions that mayappear to him to be necessary or advisable during theprogress of the work, and the Contractor shall be bound tocarry out the work in accordance with any instructions in thisconnection which may be given to him in writing signed bythe Engineer-in-charge and such alteration shall notinvalidate the contract, and any additional work which theContractor may be directed to do in the manner abovespecified as part of the work shall be carried out by theContractor on the same conditions in all respects tender forthe main work. And if the additional and altered work includesany class of Work includes any class of work for which norate is specified in this contract, then such class of work shallbe carried out at the rates entered in the schedule of Rates ofthe Division or at the rates mutually agreed upon betweenthe Engineer-in-charge and the Contractor, whichever arelower. If the additional or altered work for which no rate isentered in the Schedule of Rates of the Division, is orderedto be carried out before the rates are agreed upon then theContractor shall within seven days of the date of receipt byhim of the order to carry out the work inform the Engineer-inchargeof the rate which it is his intention to charge for suchclass of work and if the Engineer-in-charge does not agreeto this rate, he shall by notice in writing be at liberty to cancelhis order to carry out such class of work, and arrange to carryit out in such manner as he may consider advisableprovided always that if the Contractor shall commence workSignature of the Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!