13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

63Dy.Ex.Engr.Bills to be printed onformsStores supplied byGovernmentClause 11 - The Contractor shall submit all bills on theprinted forms to be had on application at the office of theEngineer-in-charge. The charges to be made in the billsshall always be entered at the rates specified in the tender orin the case of any extra work ordered in pursuance of theseconditions and not mentioned or provided for in the tender, atthe rates hereinafter provided for such work.Clause 12- If the specification or estimate of the workprovides for the use of any special description of materials tobe supplied from the stores of the Department or if it isrequired that the Contractor shall use certain stores to beprovided by the Engineer-in-charge (such material andstores and the price to be charged therefore as hereinaftermentioned being so far as practicable for the convenience ofthe Contractor but not so as in any way to control themeaning or effect of this contract specified in the schedule ormemorandum hereto annexed ) the Contractor shall besupplied with such materials and stores, as may be requiredfrom time to time to be used by him for the purposes ofcontract only and the value of full quantity of the materialsand the stores so supplied shall be set off or deducted fromany sums then due, or thereafter to become due to theContractor under the contract, or otherwise or from thesecurity deposit , the same of a sufficient portion thereof shallin that case be sold for the purpose. All materials supplied tothe Contractor shall remain the absolute property of theGovernment and shall on no account be removed from thesite of the work, and shall at all times be open for inspectionby the Engineer – in- charge. Any such materials unused andin perfectly good condition at the time of completion ortermination of the contract shall be returned to theDepartmental stores if the Engineer-in-charge so requires bya notice in writing given under his hand, but the contractorshall not be entitled to return any such materials except withsuch consent of the Engineer-in-charge so requires by anotice in writing given under his hand, but the Contractorshall not be entitled to return any such material except withsuch consent of the Engineer-in-charge and he shall haveno claim for compensation on account of any such materialsupplied to him as aforesaid but remaining unused by him orfor any wastage in or damage to any such material.Signature of the Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!