62Dy.Ex.Engr.estimated to cost more then Rupees One Thousand theContractor shall on submitting a monthly bill therefore, beentitled to receive payment proportionate to the part of thework then approved and passed by the Engineer-in-charge,whose certificate of such approval and passing of the sumso payable shall be final and conclusive against theContractor. All such intermediate payments shall beregarded as a payment by way of advance against the finalpayments only and not as payments for work actually doneand completed and shall not preclude the Engineer-in-chargefrom requiring any bad, unsound, imperfect or unskillful workto be removed or taken away and reconstructed or reerectednor shall any such payment be considered as anadmission of the due performance of the contract or any partthereof in any respect or the occurring of any claim nor shallit conclude, determine or affect in any other way the powersof the Engineer-in-charge as to the final settlement andadjustment of the accounts or otherwise or in any other wayvary or affect the contract. The final bill shall be submitted bythe Contractor within one month of the date fixed for thecompletion of the work, otherwise the Engineer–in-charge’scertificate of the measurements and of the total amountpayable for the work shall be final and binding on all theparties.Payment atreduced rates onaccount of items ofwork not acceptedas so completed, tobe at the discretionof the Engineer-incharge.Bills to be submittedmonthly.Clause 9- The rates for several items of works estimated tocost more than Rs.,1,000/- agreed to within shall be validonly when the items concerned is accepted as having beencompleted fully in accordance with the sanctionedspecifications. In cases where the items of work are notaccepted as so contemplated by the Engineer-in-charge hemay make payment on account of such items at suchreduced rates as he may consider reasonable in thepreparation of final or on account bills.Clause 10 - A bill shall be submitted by the contractor ineach month on or before the dated fixed by the Engineer-inchargefor all works executed in the previous month, andthe Engineer-in-charge shall take or cause to be taken therequisite measurements for the purpose of having the sameverified and the claim, so far as it is admissible shall beadjusted, if possible, within ten days from the presentation ofthe bill. If the Contractor does not submit the bill within thetime fixed as aforesaid, the Engineer-in-charge may depute asubordinate to measure up the said work in the presence ofthe Contractor or his duly authorized agent whose countersignature to the measurement list shall be sufficient warrant,and the Engineer-in-charge may prepare a bill from such listwhich shall be binding on the Contractor in all respects.Signature of the Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!