13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

38Dy.Ex.Engr.7. I/We shall also maintain the required standard traffic regulation system, withoutany extra cost to Government.8. That the department does not take any responsibility to acquire, maintain andutilise the land for the above purpose.9. I/We am/are aware of the fact that I/We , myself/ ourselves shall have to makeall arrangements , without any extra cost to Government to obtain the facilities ifrequired such as Electric Connection, Water supply , Telephone etc. and such otheramenities as may be desired by the concerned authorities/ representatives of theother Department at any time without prior notice.10. I / We am / are aware that the erected Drum Mix Plant shall be freely availablefor inspection to any authorities of the other Department also.11. I / We am / are aware that the fact I / We have to establish fully equipped fieldlaboratory at the plant site for carrying out in situ tests such as gradation, extractionalso other routine tests and as per M.O.S.T. specification as may be directed byEngineer-in-charge. 100% tests shall be performed at plant site by Chemist of thecontractor.12. I / We am / are aware that I / We have to commence this Drum Mix Plantunder supervision of Engineer-in-charge or authorised / representative of Engineer-inchargewithin maximum period of 30 days from the date of issue of work order, failingwhich I/We shall be liable to the Security Deposit will be forfeited to Government.13. I / We have carefully gone through the conditions No. 1 to 12 enlisted on pageNo. .......... and I / We shall abide by the same. The above mentioned conditions arefully binding over me/ us , I / We am / are also aware that in case I / We shall notagree to these conditions , Envelope No.2 of my /our tender will not be opened and Ishall have no objection upon it.Signature of Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!