- Page 1 and 2: PUBLIC WORKS DEPARTMENTPUBLIC WORKS
- Page 3 and 4: |ÉiÉ :- ={É +ʦɪÉÆiÉÉ,
- Page 6 and 7: GOVERNMENT OF MAHARASHTRAPublic Wor
- Page 8 and 9: I N D E XName Of Work :Improvements
- Page 10 and 11: 2 Dy.Ex.Engr.GOVERNMENT OF MAHARSHT
- Page 12: 4 Dy.Ex.Engr.4 Period for online Su
- Page 15 and 16: 7 Dy.Ex.Engr.1.3 The offer of the C
- Page 18 and 19: 10 Dy.Ex.Engr.3.2.8 Tenderers shoul
- Page 20 and 21: 12 Dy.Ex.Engr.broadband connectivit
- Page 22 and 23: 14 Dy.Ex.Engr.c. The bid hash value
- Page 24 and 25: 16 Dy.Ex.Engr.3.6.4 Use of Speciali
- Page 26 and 27: 18 Dy.Ex.Engr.3.6.10 Details of wor
- Page 28 and 29: 20 Dy.Ex.Engr.3.9 OPENING OF TENDER
- Page 30 and 31: 22 Dy.Ex.Engr.within stipulated tim
- Page 32 and 33: 24 Dy.Ex.Engr.19.0 VALIDITY PERIODT
- Page 34 and 35: 26 Dy.Ex.Engr.FORM - IList of works
- Page 36 and 37: 28 Dy.Ex.Engr.STATEMENT NO. 2’A
- Page 38 and 39: 30 Dy.Ex.Engr.(Note : To be include
- Page 40 and 41: 32 Dy.Ex.Engr.FORM - IVDetails of w
- Page 44 and 45: 36 Dy.Ex.Engr.FORM - VIIIName of te
- Page 46 and 47: 38Dy.Ex.Engr.7. I/We shall also mai
- Page 48 and 49: 40Dy.Ex.Engr.included the firm of a
- Page 50 and 51: 42Dy.Ex.Engr.In Testimony where of
- Page 52 and 53: ii)44Dy.Ex.Engr.any arrangement ent
- Page 54 and 55: 46Dy.Ex.Engr.GENERAL DESCRIPTION AN
- Page 56 and 57: 48Dy.Ex.Engr.taken by the contracto
- Page 58 and 59: 50Dy.Ex.Engr.2(A) i) The contractor
- Page 60 and 61: 52Dy.Ex.Engr.machinery required for
- Page 62 and 63: 54Dy.Ex. Engr.percent to 10 percent
- Page 64 and 65: 56Dy.Ex.Engr.CONDITIONS OF CONTRACT
- Page 66 and 67: 58Dy.Ex.Engr.** Note : The quantity
- Page 68 and 69: 60Dy.Ex.Engr.loss sustained by reas
- Page 70 and 71: 62Dy.Ex.Engr.estimated to cost more
- Page 72 and 73: 64Dy.Ex.Engr.Works to beexecuted in
- Page 74 and 75: 66Dy.Ex.Engr.to the unexecuted part
- Page 76 and 77: 68Dy.Ex. Engr.P.W.D. ResolutionNo.
- Page 78 and 79: Contractor tosupply plant, ladder,s
- Page 80 and 81: 72Dy.Ex.Engr.l) When persons are em
- Page 82 and 83: 74Dy.Ex.Engr.Employment offemale la
- Page 84 and 85: 76Dy.Ex.Engr.and if they are not en
- Page 86 and 87: 78Dy.Ex.Engr.Claim for quantitiesen
- Page 88 and 89: Method ofpaymentAcceptance ofcondit
- Page 90 and 91: 82Dy.Ex.Engr.GovernmentCircular No.
- Page 92 and 93:
84Dy.Ex.Engr.( Telephone No. 022 -2
- Page 94 and 95:
86ADDITIONAL CONDITIONS FOR MATERIA
- Page 96 and 97:
88Dy.Ex. Engr.After completion of t
- Page 98 and 99:
90Dy.Ex. Engr.Accompaniments to Gov
- Page 100 and 101:
92Dy.Ex. Engr.consideration for pre
- Page 102 and 103:
94Dy.Ex. Engr.ADDITIONAL GENERAL CO
- Page 104 and 105:
96be known) under whose control the
- Page 106 and 107:
98Dy.Ex. Engr.iii) Between the quan
- Page 108 and 109:
100Dy.Ex. Engr.The Executive Engine
- Page 110 and 111:
102Dy.Ex. Engr.provided by the Depa
- Page 112 and 113:
104Dy.Ex. Engr.2) Auto CAD, non-aut
- Page 114 and 115:
10615.1 Frequency Chart for Testing
- Page 116 and 117:
108Dy.Ex. Engr.9. Open gradedpremix
- Page 118 and 119:
110Dy.Ex. Engr.13. InterlockingConc
- Page 120 and 121:
112Dy.Ex. Engr.binder content. All
- Page 122 and 123:
any compensation on this behalf.114
- Page 124 and 125:
116Dy.Ex. Engr.14) Providing full l
- Page 126 and 127:
118Dy.Ex. Engr.2 . The contractor s
- Page 128 and 129:
120Dy.Ex. Engr.26.1 Unless separate
- Page 130 and 131:
122Dy.Ex. Engr.this respect will be
- Page 132 and 133:
124Dy.Ex. Engr.27.20 Any consignmen
- Page 134 and 135:
126Dy.Ex. Engr.verification for the
- Page 136 and 137:
128Dy.Ex. Engr.28.3 In case it beco
- Page 138 and 139:
13029. PAYMENTS AND MEASUREMENTS :-
- Page 140 and 141:
132Dy.Ex. Engr.32.2 The contractor
- Page 142 and 143:
excepted Risk.134Dy.Ex. Engr.37. AD
- Page 144 and 145:
136Dy.Ex. Engr.2. The contractor ha
- Page 146 and 147:
138Dy.Ex. Engr.b) The base on which
- Page 148 and 149:
140Dy.Ex. Engr.free of oil and loos
- Page 150 and 151:
142+.Gòú. +ÊvÉEòÉ®úÒ SÉÉ
- Page 152 and 153:
144Dy.Ex. Engr.Extract from specifi
- Page 154 and 155:
146Dy.Ex. Engr.Rd.33.2 Road Diversi
- Page 156 and 157:
148Dy.Ex. Engr.plus 12 mm. For 25 m
- Page 158 and 159:
Dy.Ex.Engr.Sr.NoName of Work :--Imp
- Page 160 and 161:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 162 and 163:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 164 and 165:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 166 and 167:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 168 and 169:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 170 and 171:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 172 and 173:
Dy.Ex.Engr.1 2 3 4 53 Excavation fo
- Page 174 and 175:
Dy.Ex.Engr.1 2 3 4 59 Providing and
- Page 176 and 177:
Dy.Ex.Engr.1 2 3 4 513 Providing,la
- Page 178 and 179:
Dy.Ex.Engr.1 2 3 4 516 Dismantaling
- Page 180 and 181:
Dy.Ex.Engr.1 2 3 4 520 Providing an
- Page 182 and 183:
Dy.Ex.Engr.1 2 3 4 525 Providing an
- Page 184 and 185:
Dy.Ex.Engr.1 2 3 4 529 Laboratory T
- Page 186 and 187:
178{ÉÖÆVÉÒiÉ b÷ÉƤɮú
- Page 188:
180 Dy.Ex.Engr.D R A W I N G SCONTR