- Page 1 and 2: PUBLIC WORKS DEPARTMENTPUBLIC WORKS
- Page 3: |ÉiÉ :- ={É +ʦɪÉÆiÉÉ,
- Page 7 and 8: e-tender time table1 Download Perio
- Page 9 and 10: 1 Dy.Ex.Engr.D I S C L A I M E R1.
- Page 11 and 12: 3 Dy.Ex.Engr.DETAILS OF WORKName of
- Page 14 and 15: 6 Dy.Ex.Engr.GOVERNMENT OF MAHARSHT
- Page 16: 8 Dy.Ex.Engr.c) Tender Units : The
- Page 19 and 20: 11 Dy.Ex.Engr.The Digital Certifica
- Page 21 and 22: 13 Dy.Ex.Engr.It is mandatory to up
- Page 23 and 24: 15 Dy.Ex.Engr.7. Shortlisting of Co
- Page 25 and 26: 17 Dy.Ex.Engr.(III)(IV)(V)(VI)He sh
- Page 27 and 28: 19 Dy.Ex.Engr.b) Satisfactory compl
- Page 29 and 30: 21 Dy.Ex.Engr.Works (South) Divisio
- Page 31 and 32: 23 Dy.Ex.Engr.11.0 POWER OF ATTORNE
- Page 33 and 34: 25 Dy.Ex.Engr.100 Rs. BondºÉiªÉ
- Page 35 and 36: 27 Dy.Ex.Engr.FORM - IIName of tend
- Page 37 and 38: 29 Dy.Ex.Engr.and in conformity wit
- Page 39 and 40: 31 Dy.Ex.Engr.FORM - IIIName of the
- Page 41 and 42: 33 Dy.Ex.Engr.FORM - VDetails of Te
- Page 43 and 44: 35 Dy.Ex.Engr.FORM - VIIMaximum val
- Page 45 and 46: 37SAMPLE FORMDy.Ex.Engr.DECLARATION
- Page 47 and 48: 39ARTICLES OF AGREEMENTDy.Ex.Engr.(
- Page 49 and 50: 2) Date of Hire :41Dy.Ex.Engr.It is
- Page 51 and 52: 43FORM - IX(On Stamp Paper of worth
- Page 53 and 54: 45Dy.Ex.Engr.NAME OF WORK : IMPROVE
- Page 55 and 56:
47THE METHOD AND SEQUENCE OF EXECUT
- Page 57 and 58:
49FORM B-1Dy.Ex.Engr.--------------
- Page 59 and 60:
51Dy.Ex.Engr.being accepted, the Co
- Page 61 and 62:
53Dy.Ex.Engr.TENDER FOR WORKS* In f
- Page 63 and 64:
55Dy.Ex. Engr.exemption in so far a
- Page 65 and 66:
57Dy.Ex.Engr.cancelled and legal st
- Page 67 and 68:
59Dy.Ex.Engr.charged establishment
- Page 69 and 70:
61Dy.Ex.Engr.Extension of timeClaus
- Page 71 and 72:
63Dy.Ex.Engr.Bills to be printed on
- Page 73 and 74:
65Dy.Ex.Engr.or incur any expenditu
- Page 75 and 76:
67Dy.Ex.Engr.It shall be open to th
- Page 77 and 78:
69Dy.Ex. Engr.or placed beyond the
- Page 79 and 80:
71Dy.Ex.Engr.ii) As far as possible
- Page 81 and 82:
73Dy.Ex.Engr.i) In the case of a ho
- Page 83 and 84:
75Dy.Ex.Engr.Direction andcontrol o
- Page 85 and 86:
Compensationunder Workmen'sCompensa
- Page 87 and 88:
79Dy.Ex.Engr.Employment offamine la
- Page 89 and 90:
81Dy.Ex.Engr.Maharashtra ValueAdded
- Page 91 and 92:
83Dy.Ex.Engr.CONDITIONS FOR MALARIA
- Page 93 and 94:
85Dy.Ex. Engr.SCHEDULE - 'A'.Schedu
- Page 95 and 96:
87Dy.Ex. Engr.6. The charges for co
- Page 97 and 98:
89Dy.Ex. Engr.7. The procurement of
- Page 99 and 100:
91Dy.Ex. Engr.K 1 = Percentage of l
- Page 101 and 102:
(III)93THE FOLLOWING CONDITIONS SHA
- Page 103 and 104:
95ADDITIONAL GENERAL CONDITIONS AND
- Page 105 and 106:
97Dy.Ex. Engr.Contract or part (s)
- Page 107 and 108:
99Dy.Ex. Engr.materials etc. and ob
- Page 109 and 110:
101Dy.Ex. Engr.Priorities for items
- Page 111 and 112:
103Dy.Ex. Engr.The checking or insp
- Page 113 and 114:
105Dy.Ex. Engr.liability of the Con
- Page 115 and 116:
107Dy.Ex. Engr.5. Water BoundMacada
- Page 117 and 118:
109Dy.Ex. Engr.10. ThermoplasticPai
- Page 119 and 120:
111b) Code of Practice for Road and
- Page 121 and 122:
113Dy.Ex. Engr.with the approval of
- Page 123 and 124:
115Dy.Ex. Engr.1) The contractor sh
- Page 125 and 126:
117Dy.Ex. Engr.24 MEDICAL AND SANIT
- Page 127 and 128:
119Dy.Ex. Engr.25.6 The quarrying o
- Page 129 and 130:
121Dy.Ex. Engr.and are inclusive of
- Page 131 and 132:
123Dy.Ex. Engr.in advance by the co
- Page 133 and 134:
125Dy.Ex. Engr.registers does not a
- Page 135 and 136:
127Dy.Ex. Engr.27.48 (a) The aggreg
- Page 137 and 138:
129Dy.Ex. Engr.28.12 Defective work
- Page 139 and 140:
131Dy.Ex. Engr.Clause 20 and this s
- Page 141 and 142:
35. PLANT:-133Dy.Ex. Engr.All const
- Page 143 and 144:
135Dy.Ex. Engr.get those approved f
- Page 145 and 146:
137Bridge Works, 4th Revision, Augu
- Page 147 and 148:
139Dy.Ex. Engr.period which is earl
- Page 149 and 150:
141Dy.Ex. Engr.b÷ÉƤɮúÒEò
- Page 151 and 152:
143WORK METHODOLOGY FOR SEAL COATDy
- Page 153 and 154:
145Dy.Ex. Engr.Table 900-2 Maximum
- Page 155 and 156:
41.3 Stone aggregates :147Dy.Ex. En
- Page 157 and 158:
149ROUGHNESS INDEXDy.Ex. Engr.The C
- Page 159 and 160:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 161 and 162:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 163 and 164:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 165 and 166:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 167 and 168:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 169 and 170:
Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 171 and 172:
Dy.Ex.Engr.Name of Work :--Improvem
- Page 173 and 174:
Dy.Ex.Engr.1 2 3 4 57 Providing ear
- Page 175 and 176:
Dy.Ex.Engr.1 2 3 4 511 Providing an
- Page 177 and 178:
Dy.Ex.Engr.1 2 3 4 514 Providing an
- Page 179 and 180:
Dy.Ex.Engr.1 2 3 4 519 Providing an
- Page 181 and 182:
Dy.Ex.Engr.1 2 3 4 521 Providing an
- Page 183 and 184:
Dy.Ex.Engr.1 2 3 4 528 Providing an
- Page 185 and 186:
177xÉÉånù´É½þÒJÉb÷ÒSª
- Page 187 and 188:
179xÉÉånù´É½þÒ Gò¨ÉÉÆ