View Tender Document - e-Tendering
View Tender Document - e-Tendering View Tender Document - e-Tendering
24 Dy.Ex.Engr.19.0 VALIDITY PERIODThe offer shall remain open for acceptance for minimum period of 120 daysfrom the Date of opening of Envelope No.2 (Financial Bid) and thereafter until itis withdrawn by the contractor by notice in writing duly addressed to theauthority opening the tender and sent by Registered Post Acknowledgmentdue.20.00 After completion of the e-tendering process, the successful bidder will have tosubmit the hard copy of downloaded tender document and drawings dulysigned on each page by the contractor or his authorised signatory. The tendershould bear full signature of the tenderer, or his authorized power of attorneyholder in case of Firm.Signature of Contractor No. of Corrections Executive Engineer
25 Dy.Ex.Engr.100 Rs. BondºÉiªÉ|ÉÊiÉYÉÉ ±ÉäJÉ (Affidavit)¨ÉÒ_________________________________ ´ÉªÉ ´É¹ÉÇ ®úɽþhÉÉ®ú_________________________________ªÉÉ ºÉiªÉ|ÉÊiÉYÉÉ ±ÉäJÉÉuùÉ®äú ʱɽÚþxÉ näùiÉÉä EòÒ ¨ÉÒ/_________________________________ªÉÉ EÆò{ÉxÉÒSÉÉ/¡ò¨ÉÇSÉÉ |ÉÉä|ÉɪÉ]õ®ú/¦ÉÉMÉÒnùÉ®ú +ºÉÚxÉ“Improvements (Windening) to Paud Kolwan Fagne Dam Road (MDR-26) Km.3/500 to 16/400 ( Km. 12/500 to 16/400), Taluka Mulshi, Dist. Pune. ”ªÉÉ EòɨÉɺÉÉ`öÒ ÊxÉÊ´ÉnùÉ ºÉÉnù®ú Eäò±ÉÒ +ɽäþ. ÁÉ ÊxÉÊ´ÉnäùSªÉÉ Envelope No.1 ¨ÉvªÉä VÉÒ EòÉMÉnù{ÉjÉä ºÉÉnù®ú Eäò±ÉÒ+ɽäþiÉ iÉÒ JÉ®úÒ, ¤É®úÉä¤É®ú ´É {ÉÚhÉÇ +ɽäþiÉ. ÁɨÉvªÉä EòÉähÉiªÉɽþÒ jÉÖ]õÒ, SÉÖEòÉ xÉɽþÒiÉ +ºÉä É{ÉlÉ{ÉÚ´ÉÇEò ¨ÉÉxªÉ Eò®úÒiÉ+ɽäþ. ÁÉ EòÉMÉnù{ÉjÉÉƨÉvªÉä EòɽþÒ SÉÖEòÒSÉÒ ÊnùÉɦÉÚ±É Eò®úhÉÉ®úÒ, JÉÉä]õÒ iɺÉäSÉ +{ÉÚhÉÇ ¨ÉÉʽþiÉÒ +Éfø³ý±ªÉÉºÉ ¨ÉÒEòɪÉnäùÉÒ®ú EòɪÉÇ´ÉɽþÒºÉ {ÉÉjÉ +ɽäþ ´É ®úɽþÒxÉ.EÆòjÉÉ]õnùÉ®úÉSÉÒ ºÉ½þÒSignature of Contractor No. of Corrections Executive Engineer
- Page 1 and 2: PUBLIC WORKS DEPARTMENTPUBLIC WORKS
- Page 3 and 4: |ÉiÉ :- ={É +ʦɪÉÆiÉÉ,
- Page 6 and 7: GOVERNMENT OF MAHARASHTRAPublic Wor
- Page 8 and 9: I N D E XName Of Work :Improvements
- Page 10 and 11: 2 Dy.Ex.Engr.GOVERNMENT OF MAHARSHT
- Page 12: 4 Dy.Ex.Engr.4 Period for online Su
- Page 15 and 16: 7 Dy.Ex.Engr.1.3 The offer of the C
- Page 18 and 19: 10 Dy.Ex.Engr.3.2.8 Tenderers shoul
- Page 20 and 21: 12 Dy.Ex.Engr.broadband connectivit
- Page 22 and 23: 14 Dy.Ex.Engr.c. The bid hash value
- Page 24 and 25: 16 Dy.Ex.Engr.3.6.4 Use of Speciali
- Page 26 and 27: 18 Dy.Ex.Engr.3.6.10 Details of wor
- Page 28 and 29: 20 Dy.Ex.Engr.3.9 OPENING OF TENDER
- Page 30 and 31: 22 Dy.Ex.Engr.within stipulated tim
- Page 34 and 35: 26 Dy.Ex.Engr.FORM - IList of works
- Page 36 and 37: 28 Dy.Ex.Engr.STATEMENT NO. 2’A
- Page 38 and 39: 30 Dy.Ex.Engr.(Note : To be include
- Page 40 and 41: 32 Dy.Ex.Engr.FORM - IVDetails of w
- Page 42 and 43: FORM NO.VI34 Dy.Ex.Engr.STATEMENT S
- Page 44 and 45: 36 Dy.Ex.Engr.FORM - VIIIName of te
- Page 46 and 47: 38Dy.Ex.Engr.7. I/We shall also mai
- Page 48 and 49: 40Dy.Ex.Engr.included the firm of a
- Page 50 and 51: 42Dy.Ex.Engr.In Testimony where of
- Page 52 and 53: ii)44Dy.Ex.Engr.any arrangement ent
- Page 54 and 55: 46Dy.Ex.Engr.GENERAL DESCRIPTION AN
- Page 56 and 57: 48Dy.Ex.Engr.taken by the contracto
- Page 58 and 59: 50Dy.Ex.Engr.2(A) i) The contractor
- Page 60 and 61: 52Dy.Ex.Engr.machinery required for
- Page 62 and 63: 54Dy.Ex. Engr.percent to 10 percent
- Page 64 and 65: 56Dy.Ex.Engr.CONDITIONS OF CONTRACT
- Page 66 and 67: 58Dy.Ex.Engr.** Note : The quantity
- Page 68 and 69: 60Dy.Ex.Engr.loss sustained by reas
- Page 70 and 71: 62Dy.Ex.Engr.estimated to cost more
- Page 72 and 73: 64Dy.Ex.Engr.Works to beexecuted in
- Page 74 and 75: 66Dy.Ex.Engr.to the unexecuted part
- Page 76 and 77: 68Dy.Ex. Engr.P.W.D. ResolutionNo.
- Page 78 and 79: Contractor tosupply plant, ladder,s
- Page 80 and 81: 72Dy.Ex.Engr.l) When persons are em
24 Dy.Ex.Engr.19.0 VALIDITY PERIODThe offer shall remain open for acceptance for minimum period of 120 daysfrom the Date of opening of Envelope No.2 (Financial Bid) and thereafter until itis withdrawn by the contractor by notice in writing duly addressed to theauthority opening the tender and sent by Registered Post Acknowledgmentdue.20.00 After completion of the e-tendering process, the successful bidder will have tosubmit the hard copy of downloaded tender document and drawings dulysigned on each page by the contractor or his authorised signatory. The tendershould bear full signature of the tenderer, or his authorized power of attorneyholder in case of Firm.Signature of Contractor No. of Corrections Executive Engineer