13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17 Dy.Ex.Engr.(III)(IV)(V)(VI)He shall give trial run on or before 75th day from the date of issue ofwork order.In Envelope no.1 the bidder shall submit an additional Security, ofRs. 10,00,000.00 ( Rupees Ten Lakh Only ) in the form of FDR drawnin the name of Executive Engineer, PW (South) Division, Punepayable at Pune. If Contractor fails to give trial run of this batch mixplant on or before 75th day, from the date of issue of the said WorkOrder, his above said additional Security shall be encashed withoutany notice to the contractor without considering any force majeureand shall be credited to Government revenue by the Engineer Inchargeimmediately on 76 th day.Encashment of additional Security deposit as mentioned above shallnot absolved the Contractor from the responsibility of installing theBatch Mix Plant which is required for carrying out Hot Mix Work. Atthe same time the above amount Rs. 10,00,000/- so encashedshall not be refunded.No extension of time limit shall be granted at any level for giving trialrun after 75th day from the date of issue of work order.C) Once the option of Drum mix Hot Mix plant or Batch Type Hot Mix Plant isexercised at the time of submitting the bid, it shall be mandatory to carryout the work by the same type of Hot Mix Plant.3.6.5 Details of Income Tax Circle or ward of the district in which the tenderer isassessed to Income Tax , <strong>Tender</strong>er’s PAN No. and complete postal addresswith Pin Code and telephone Numbers. Scanned copy of original Income TaxReturn for the immediate previous financial year.3.6.6 Scanned copy of original valid MVAT registration certificate from MaharashtraState Sale Tax Department. (Maharashtra Value Added Tax Act 2005)3.6.7 Scanned copy of a list of modern machinery and plants immediately availablewith the tenderer for use on this work and list of machinery proposed to beutilised on this work but not immediately available and manner in which it isproposed to be procured ( in Form No. 2 ,& 2A)3.6.8 Scanned copy original Professional Tax Registration Certificate in formPTR and PTE.3.6.9 Details of work done during last three years with the value of work unfinished.(Information to be given in Form No. VI)Signature of Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!