Dy.Ex.Engr.1 2 3 4 516 Dismantaling of stone masonry in lime or cementmortar including stacking the materials as directedwith all leads,lifts complete.As directed by Engineer in charge.17 Excavation for foundation by mechanical meansfor cross drainage works, reinforced cementconcrete gutter and retaining wall in earth,soil ofall types, sand ,gravel and soft murum ,includingremoving the excavated material up to a distance of50 metre beyond the work area and stacking andspreading as directed,dewatering preparing the bedfor the foundation and necessary back filling,ramming, watering including shoring and struttingetc.complete.BdA-1 259 The useful excavated materials shall be utilised asdirected by the Engineer In Charge.18 Excavation for foundation by mechanical meansfor cross drainage works, reinforced cementconcrete gutter and retaining wall in hard murumincluding removing the excavated material upto adistance of 50 metre beyond the excavated area alllifts ,and stacking and spreading as directed,dewatering,shoring and strutting preparing the bedfor foundation and necessary back filling ramming,watering etc complete.BdA-2 259 The useful excavated materials shall be utilised asdirected by the Engineer In Charge.Contractor No.of Corrections Executive Engineer 170
Dy.Ex.Engr.1 2 3 4 519 Providing and laying in situ cement concrete of Mix-10 proportion with trap metal with crushed sand forfoundation and bedding including dewateringnecessary ,formwork ,compacting and curingcomplete.CD-3 160Contractor No.of Corrections Executive Engineer 171
- Page 128 and 129: 120Dy.Ex. Engr.26.1 Unless separate
- Page 130 and 131: 122Dy.Ex. Engr.this respect will be
- Page 132 and 133: 124Dy.Ex. Engr.27.20 Any consignmen
- Page 134 and 135: 126Dy.Ex. Engr.verification for the
- Page 136 and 137: 128Dy.Ex. Engr.28.3 In case it beco
- Page 138 and 139: 13029. PAYMENTS AND MEASUREMENTS :-
- Page 140 and 141: 132Dy.Ex. Engr.32.2 The contractor
- Page 142 and 143: excepted Risk.134Dy.Ex. Engr.37. AD
- Page 144 and 145: 136Dy.Ex. Engr.2. The contractor ha
- Page 146 and 147: 138Dy.Ex. Engr.b) The base on which
- Page 148 and 149: 140Dy.Ex. Engr.free of oil and loos
- Page 150 and 151: 142+.Gòú. +ÊvÉEòÉ®úÒ SÉÉ
- Page 152 and 153: 144Dy.Ex. Engr.Extract from specifi
- Page 154 and 155: 146Dy.Ex. Engr.Rd.33.2 Road Diversi
- Page 156 and 157: 148Dy.Ex. Engr.plus 12 mm. For 25 m
- Page 158 and 159: Dy.Ex.Engr.Sr.NoName of Work :--Imp
- Page 160 and 161: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 162 and 163: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 164 and 165: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 166 and 167: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 168 and 169: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 170 and 171: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 172 and 173: Dy.Ex.Engr.1 2 3 4 53 Excavation fo
- Page 174 and 175: Dy.Ex.Engr.1 2 3 4 59 Providing and
- Page 176 and 177: Dy.Ex.Engr.1 2 3 4 513 Providing,la
- Page 180 and 181: Dy.Ex.Engr.1 2 3 4 520 Providing an
- Page 182 and 183: Dy.Ex.Engr.1 2 3 4 525 Providing an
- Page 184 and 185: Dy.Ex.Engr.1 2 3 4 529 Laboratory T
- Page 186 and 187: 178{ÉÖÆVÉÒiÉ b÷ÉƤɮú
- Page 188: 180 Dy.Ex.Engr.D R A W I N G SCONTR