13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dy.Ex.Engr.1 2 3 4 516 Dismantaling of stone masonry in lime or cementmortar including stacking the materials as directedwith all leads,lifts complete.As directed by Engineer in charge.17 Excavation for foundation by mechanical meansfor cross drainage works, reinforced cementconcrete gutter and retaining wall in earth,soil ofall types, sand ,gravel and soft murum ,includingremoving the excavated material up to a distance of50 metre beyond the work area and stacking andspreading as directed,dewatering preparing the bedfor the foundation and necessary back filling,ramming, watering including shoring and struttingetc.complete.BdA-1 259 The useful excavated materials shall be utilised asdirected by the Engineer In Charge.18 Excavation for foundation by mechanical meansfor cross drainage works, reinforced cementconcrete gutter and retaining wall in hard murumincluding removing the excavated material upto adistance of 50 metre beyond the excavated area alllifts ,and stacking and spreading as directed,dewatering,shoring and strutting preparing the bedfor foundation and necessary back filling ramming,watering etc complete.BdA-2 259 The useful excavated materials shall be utilised asdirected by the Engineer In Charge.Contractor No.of Corrections Executive Engineer 170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!