13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dy.Ex.Engr.1 2 3 4 53 Excavation for catch /side water gutter bymechanical means in hard murum to the specifiedsection including stacking the excavated stuff inregular bund and disposing of unsuitable or excessstuff as directed .Rd-9 187 The useful excavated material shall be utilised asdirected by the Engineer In Charge .The contractrate shall be for One Cubic Meter instead of ofone running meter as mentioned in specification.4 Excavation for catch /side water gutter in softrock to the specified section including stacking theexcavated stuff in regular bund and disposing ofunsuitable or excess stuff as directed .5 Excavation for catch /side water gutter in hardrock by blasting,chiselling,wedging or line drillingto the specified section including stacking theexcavated stuff in regular bund and disposing ofunsuitable or excess stuff as directed .Rd-9 187 The useful excavated material shall be utilised asdirected by the Engineer In Charge .The contractrate shall be for One Cubic Meter instead of ofone running meter as mentioned in specification.Rd-9 187 The useful excavated material shall be utilised asdirected by the Engineer In Charge .The contractrate shall be for One Cubic Meter instead of onerunning meter as mentioned in specification.6 Providing earth work , watering and compacting ofembankment formed of materials obtained from theroad cutting, within all leads to 95 percentage ofstandard proctor density after laying them in layersof 20 centimetre. to 30centimetre. with powerroller.Rd-10 187-189 As directed by Engineer in charge.Contractor No.of Corrections Executive Engineer 164

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!