Dy.Ex.Engr.Sr.NoQuantityEstimatedbut may bemore or lessItem of WorkIn figuresEstimated RateIn WordsUnit PerAmount accordingto estimatedquantity1 2 3 4 5 6 742 14.00 Test of Bitumen-Viscosity.1050.00 Rupees One Thousand One Test 14700.00TestFifty and Paise NilOnly4313.00TestTest of Aggregate-impactvalue/los angeles abraison value 850.00 Rupees Eight One Test 11050.00Hundred Fifty andPaise Nil Only44 8.00 Test of Bitumen-Extraction Test.1100.00 Rupees One ThousandOne Hundred and45Test6.00 Test of Concrete-Compressive Strength OF Cement concrete. 450.00Paise Nil OnlyRupees Four HundredTest Cube(Set of 3 cubes).FiftyOnlyand Paise Nil46 2.00TestTest of Concrete-concrete mix design 8000.00 RupeesThousandNil OnlyEightand Paise47 1.00 Test of Cement-standard consistency 2500.00 Rupees TwoThousand FiveTestHundred and Paise NilOnlyRupees One Crore Eighty Six Lakhs Eighty Nine Thousand One Hundred Sixty Four and Paise Nil onlyOne TestOne Test 2500.00Total Rs. 18689164.36Say Rs.8800.00One Test 2700.00One Test 16000.0018689164.00Contractor No. of Corrections Executive Engineer 162
Dy.Ex.Engr.Name of Work :--Improvements (Widening)to Paud Kolwan Fagane Dam Road,Km 3/500 to 16/400 (12/500 to 16/400) MDR 26 Tal-Mulshi,Dist-PuneSr.NoItem of WorkSpecification NoPage No1 2 3 4 51 Excavation for roadway by Mechanical means inearth,soil of all sorts ,sand ,gravel or soft murumincluding dressing section to the required grade,camber,and side slopes and conveying theexcavated materials with all lifts and leads andspreading for embankment or stacking as directedetc.complete.SCHEDULE- 'C'Detailed Itemwise SpecificationReference to Standard Specification BookVolume I 1979 edition and Volume II 1981edition and Specification for Road and Bridgeworks published by Ministry of Road Transport2001 edition (Latest Edition)Additional Specification if anyRd-2 180-183 The useful excavated material shall be utilised asdirected by the Engineer In Charge .2 Excavation for catch /side water gutter bymechanical means in earth , soil of all sorts , sand ,gravel , or soft murum to the specified sectionincluding stacking the excavated stuff in regularbund and disposing of unsuitable or excess stuff asdirected .Rd-9 187 The useful excavated material shall be utilised asdirected by the Engineer In Charge .The contractrate shall be for One Cubic Meter instead of ofone running meter as mentioned in specification.Contractor No.of Corrections Executive Engineer 163
- Page 120 and 121: 112Dy.Ex. Engr.binder content. All
- Page 122 and 123: any compensation on this behalf.114
- Page 124 and 125: 116Dy.Ex. Engr.14) Providing full l
- Page 126 and 127: 118Dy.Ex. Engr.2 . The contractor s
- Page 128 and 129: 120Dy.Ex. Engr.26.1 Unless separate
- Page 130 and 131: 122Dy.Ex. Engr.this respect will be
- Page 132 and 133: 124Dy.Ex. Engr.27.20 Any consignmen
- Page 134 and 135: 126Dy.Ex. Engr.verification for the
- Page 136 and 137: 128Dy.Ex. Engr.28.3 In case it beco
- Page 138 and 139: 13029. PAYMENTS AND MEASUREMENTS :-
- Page 140 and 141: 132Dy.Ex. Engr.32.2 The contractor
- Page 142 and 143: excepted Risk.134Dy.Ex. Engr.37. AD
- Page 144 and 145: 136Dy.Ex. Engr.2. The contractor ha
- Page 146 and 147: 138Dy.Ex. Engr.b) The base on which
- Page 148 and 149: 140Dy.Ex. Engr.free of oil and loos
- Page 150 and 151: 142+.Gòú. +ÊvÉEòÉ®úÒ SÉÉ
- Page 152 and 153: 144Dy.Ex. Engr.Extract from specifi
- Page 154 and 155: 146Dy.Ex. Engr.Rd.33.2 Road Diversi
- Page 156 and 157: 148Dy.Ex. Engr.plus 12 mm. For 25 m
- Page 158 and 159: Dy.Ex.Engr.Sr.NoName of Work :--Imp
- Page 160 and 161: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 162 and 163: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 164 and 165: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 166 and 167: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 168 and 169: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 172 and 173: Dy.Ex.Engr.1 2 3 4 53 Excavation fo
- Page 174 and 175: Dy.Ex.Engr.1 2 3 4 59 Providing and
- Page 176 and 177: Dy.Ex.Engr.1 2 3 4 513 Providing,la
- Page 178 and 179: Dy.Ex.Engr.1 2 3 4 516 Dismantaling
- Page 180 and 181: Dy.Ex.Engr.1 2 3 4 520 Providing an
- Page 182 and 183: Dy.Ex.Engr.1 2 3 4 525 Providing an
- Page 184 and 185: Dy.Ex.Engr.1 2 3 4 529 Laboratory T
- Page 186 and 187: 178{ÉÖÆVÉÒiÉ b÷ÉƤɮú
- Page 188: 180 Dy.Ex.Engr.D R A W I N G SCONTR
Dy.Ex.Engr.Sr.NoQuantityEstimatedbut may bemore or lessItem of WorkIn figuresEstimated RateIn WordsUnit PerAmount accordingto estimatedquantity1 2 3 4 5 6 742 14.00 Test of Bitumen-Viscosity.1050.00 Rupees One Thousand One Test 14700.00TestFifty and Paise NilOnly4313.00TestTest of Aggregate-impactvalue/los angeles abraison value 850.00 Rupees Eight One Test 11050.00Hundred Fifty andPaise Nil Only44 8.00 Test of Bitumen-Extraction Test.1100.00 Rupees One ThousandOne Hundred and45Test6.00 Test of Concrete-Compressive Strength OF Cement concrete. 450.00Paise Nil OnlyRupees Four HundredTest Cube(Set of 3 cubes).FiftyOnlyand Paise Nil46 2.00TestTest of Concrete-concrete mix design 8000.00 RupeesThousandNil OnlyEightand Paise47 1.00 Test of Cement-standard consistency 2500.00 Rupees TwoThousand FiveTestHundred and Paise NilOnlyRupees One Crore Eighty Six Lakhs Eighty Nine Thousand One Hundred Sixty Four and Paise Nil onlyOne TestOne Test 2500.00Total Rs. 18689164.36Say Rs.8800.00One Test 2700.00One Test 16000.0018689164.00Contractor No. of Corrections Executive Engineer 162