13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dy.Ex.Engr.Sr.NoQuantityEstimatedbut may bemore or lessItem of WorkIn figuresEstimated RateIn WordsUnit PerAmount accordingto estimatedquantity1 2 3 4 5 6 718 10.430 Excavation for foundation by mechanical means for cross drainage 153.30 Rupees One Hundred One Cubic 1598.92works, reinforced cement concrete gutter and retaining wall in hardFifty Three and Paise MetreCubic murum including removing the excavated material upto a distance ofThree OnlyMetre 50 metre beyond the excavated area all lifts ,and stacking andspreading as directed, dewatering,shoring and strutting preparing thebed for foundation and necessary back filling ramming, watering etccomplete.19 5.210CubicMetreProviding and laying in situ cement concrete of Mix-10 proportionwith trap metal with crushed sand for foundation and beddingincluding dewatering necessary ,formwork ,compacting and curingcomplete.3989.70 Rupees ThreeThousand NineHundred Eighty Nineand Paise SeventyOnlyOne CubicMetre20786.3420 43.500 Providing and laying Mix- 10 cement concrete of trap metal withcrushed sand for head walls of cross drainage works, retaining wallsetcetra including necessary formwork,compaction, finishing andCubiccuring complete.Metre4511.85 Rupees FourThousand FiveHundred Eleven andPaise Eighty FiveOnlyOne CubicMetre196265.48Contractor No. of Corrections Executive Engineer 156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!