View Tender Document - e-Tendering

View Tender Document - e-Tendering View Tender Document - e-Tendering

maharashtra.etenders.in
from maharashtra.etenders.in More from this publisher
13.07.2015 Views

142+.Gòú. +ÊvÉEòÉ®úÒ SÉÉSÉhÉÒSÉä |ɨÉÉhÉ(BEÚòhÉ {ÉÊ®ú¨ÉÉhÉÉSªÉÉ)1) EòÊxɹ`ö +ʦɪÉÆiÉÉ / ÉÉJÉÉ +ʦɪÉÆiÉÉ / ºÉ½þÉ.+ʦɪÉÆiÉÉ (¸ÉähÉÒ-2)2) ºÉ½þÉ. EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ /ºÉ½þÉ. +ʦɪÉÆiÉÉ (¸ÉähÉÒ-1)/={ÉʴɦÉÉMÉÒªÉ +ʦɪÉÆiÉÉ / ={ÉʴɦÉÉMÉÒªÉ +ÊvÉEòÉ®úÒ100 ]õCEäò25 ]õCEäò3) EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ 5 ]õCEäòDy.Ex. Engr.¡ò)ñEòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ ªÉÉÆxÉÒ b÷ÉƤɮúÒEò®úhÉÉSªÉÉ EòɨÉÉSªÉÉ iÉ{ÉɺÉhÉÒ nùÉè-ªÉÉiÉ {±ÉÉx]õ ºÉÉ

143WORK METHODOLOGY FOR SEAL COATDy.Ex. Engr.Liquid seal coat shall be executed as per Clause No. 513 of Specification for Roadand Bridge Works of M.O.R.T.&H. Specification 2001 and latest reprint amendments.Preparation of surface to receive seal coat shall be as per 513.3.3.2 and in one go200 m. only.Construction of seal coat shall be as per Clause 513.3.3.3 and shall be for 200 m.length prepared as above. The preparation of surface for seal coat and constructionof seal coat as per Clause 513.3.3.2 and 513.3.3.3 responsively as mentioned aboveshall be done in 200 m. in one go and the cycle of during in 200 m. shall be repeatedthroughout the day and at the end of the working day any fraction left measuring lessthan 200 m. shall be done separately.PROGRESSIVE METHODOLOGYThe work methodology as described above shall then be followed for next 200metres and thus progressively for entire length of road.MODE OF INSPECTION AND MEASUREMENTThe Deputy Engineer shall remain present and personally supervise centpercent ( 100%) length executed during his tenure.Signature of Contractor No. of corrections Executive Engineer

143WORK METHODOLOGY FOR SEAL COATDy.Ex. Engr.Liquid seal coat shall be executed as per Clause No. 513 of Specification for Roadand Bridge Works of M.O.R.T.&H. Specification 2001 and latest reprint amendments.Preparation of surface to receive seal coat shall be as per 513.3.3.2 and in one go200 m. only.Construction of seal coat shall be as per Clause 513.3.3.3 and shall be for 200 m.length prepared as above. The preparation of surface for seal coat and constructionof seal coat as per Clause 513.3.3.2 and 513.3.3.3 responsively as mentioned aboveshall be done in 200 m. in one go and the cycle of during in 200 m. shall be repeatedthroughout the day and at the end of the working day any fraction left measuring lessthan 200 m. shall be done separately.PROGRESSIVE METHODOLOGYThe work methodology as described above shall then be followed for next 200metres and thus progressively for entire length of road.MODE OF INSPECTION AND MEASUREMENTThe Deputy Engineer shall remain present and personally supervise centpercent ( 100%) length executed during his tenure.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!