13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7 Dy.Ex.Engr.1.3 The offer of the Contractor shall remain valid for acceptance for a minimumperiod of 120 days from the date fixed for opening of Envelope No. 2 ( Main <strong>Tender</strong>)and thereafter until it is withdrawn by the Contractor by notice in writing dulyaddressed to the authority opening the tender and sent by Registered PostAcknowledgement Due.1.4 The tender notice shall form a part of the contract agreement.1.4 The tenders are invited on the Departmental design only1.5 The tenderer if firm or company shall in their forwarding letter mention thenames of all the partners of the firm or the company ( as the case may be) and thename of the partner who holds the power attorney if any, authorising him to conducttransaction on behalf of the Firm or Company.1.6. Right is reserved to revise or amend the contract documents fully or partthereof prior to the date notified for the receipt of tender. Such deviations/amendments if any, shall be communicated in the form of corrigendum or by a letteras may be considered suitable.1.7 The tenderer shall enter his percentage rates in words and figures " below /above" . In case there is difference between percentage written in figures andwords, the lower offer will be taken as final.1.8 No pages should be removed from, added in or replaced in the <strong>Tender</strong>.1.9 Right is reserved to reject any or all tenders without assigning any reasonthereof.1.10. <strong>Tender</strong>s which do not fulfill all or any conditions or are incomplete in anyrespect are liable to summary rejection.1.11. The <strong>Tender</strong>er may, in the forwarding letter, mention any points he may wish tomake clear but right is reserved to reject the same on the whole of the tenders if thesame become conditional tender thereby.1.12 Asphalt should be brought from Government Refinery and in the name ofconcerned Contractor. Contractor should produce the original Challan to the site incharge.G E N E R A La) Time limit : The work is to be completed within time limit as specified in theNotice inviting tender which shall be reckoned from the date of written order ofcommencing the work and shall be inclusive of monsoon period.b) <strong>Tender</strong> Rate : No alteration in the form of tender and the schedule of tenderand no additions in the scope or special stipulation will be permitted. Rates quoted forthe tender shall be taken as applicable to all leads and lifts.Signature of Contractor No. of Corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!