140Dy.Ex. Engr.free of oil and loose rust scale and should be properly tied with binding wire.The size and spacing of the bars as also the cover should be checked forcorrectness.50. PAVEMENT COURSES - GENERAL CONTROLS:a) The base on which the pavement layer is to be placed should bechecked for levels and regularity, and should be in a condition to receive thepavement layer.b) Each layer should be checked for thickness, levels, cross fall (camber),regularity and strength before next layer is permitted to be laid.Signature of Contractor No. of corrections Executive Engineer