136Dy.Ex. Engr.2. The contractor has to ensure that the temperature of hot mix materialand its ingredients is within the specified range as per MOST specification atthe time of before mixing, during mixing and laying.3 Clause No. 901 of Ministry's Specifications (4th Revision, 2001)a) The responsibility for the quality of the entire construction work is on theContractor. For this purpose he is required to have his own independent andadequate setup.b) The Engineer for satisfying himself about the quality of the material andwork will also have tests conducted by quality control units or by any otheragency, generally to the frequency set out in the specifications. For test to bedone by the Engineer, the Contractor is to render all necessary co-operationand assistance including the provision of labour assistance in packing anddispatching samples etc.c) For the work of embankment, sub-grade and pavement , construction ofsubsequent layer of the same or other material over the finished layer shall bedone only after obtaining approval from the Engineer.d) The Contractor shall be responsible for rectifying / replacing any workfalling short of quality requirements as directed by the Engineer.4. CLAUSES IN THE CONDITION OF CONTRACTa) All materials and workmanship shall be of the respective type describedin the contract and in accordance with the Engineer's instructions and shall besubjected from time to time to such tests as the Engineer may direct at theplace of manufacture or fabrication, or on the site. All samples shall be suppliedby the Contractor.b) No work is to be covered up or put out of view without the approval ofthe Engineer for his examination and measurements.c) During the progress of the works, the engineer shall have the power toorder the removal from the site of any unsuitable material, substitution or propersuitable material and the removal and proper re-erection notwithstanding anyprevious test or interim payment therefore, and of any work which is in respectof materials or workmanship is not, in the opinion of the Engineer in accordancewith the contract.41 GUIDELINES ON QUALITY CONTROL OPERATIONS:The onus of achieving quality of work will be on the Contractor who will takeactions as stipulated in Section 900 of Ministry's Specifications for Road andSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!