13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

excepted Risk.134Dy.Ex. Engr.37. ADDITIONAL WORKS SPECIFICATIONS :-37.1 The whole work shall be carried out strictly in accordance with theapproved detailed drawing (unless otherwise directed) description of the items,detailed specification of the M.O.S.T. for Bridge and Road Works IlI rd Revision1995 and 4th edition 2001, standard Specification book II nod edition (withIndian Standard specification indicatedtherein) of P.W. Department, Government of Maharashtra subject to theadditional specification given for the relevant items and in the best workmenlike manner.37.2 While adopting the relevant number and pages for different items of theM.O.S.T. Specifications for Bridges and Road Works. IIl rd revision 1995Standard Specification Book, due care has been taken to indicate correctnumber and page for the various items. However if for some reasons or other itis noticed that the specification numbers and pages quoted are not pertinent,the contractor is bound to carry out the work in accordance with the correctrelevant specifications for the item or items from the standard specificationBook. After taking into account the description of the items, scope and spirit ofthe work.37.3 It is to be definitely and clearly understood that the specificationsstipulated shall be rigidly enforced and no relaxations shall be allowed. Extracharges or claims in respect of extra works shall not be entertained unless theyare clearly outside the scope of the item and its specifications to which theyrelate or unless such works are ordered in writing by the Executive Engineerand claimed for in specified manner before the same is taken in hand.38. QUALITY ASSURANCE AND MAINTENANCE:-38.1. The contractor to ensure the specified quality of work which will alsoinclude necessary surveys, temporary works etc. The contractor shall prepare aquality assurance plan and get the same approved form the Engineer-in-chargewithin one month from the date of work order. The contractor shall submit anorganization chart of his technical personnel to be deployed on the work alongwith their' qualification, job descriptions defining the functions of reporting,supervising inspecting and approving. The contractor shall also submit a list oftools, equipment and the machinery and instruments which he proposes to usefor the construction and for testing in the field and or in the laboratory andmonitoring. The contractor shall modify/supplement the organisation chart andthe list of machinery, equipment etc. as per the directions by theSuperintending Engineer Engineer-In-Charge and shall deploy the personneland equipment on the field as per the approved chart and list respectively. Thecontractor shall submit written method statements detailing his exact proposalsof execution of the work in accordance with the specification. He will have toSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!