129Dy.Ex. Engr.28.12 Defective work is liable to be rejected at any stage. The contractor, on noaccount can refuse to rectify the defects merely on reasons that further workhas been carried out No extra payment shall be made for rectification.28.13 General directions or detailed description of work, materials and itemscoverage of rates given in the specification are not necessarily repeated in theBill of Quantities. Reference is however, drawn to the appropriate sectionclause(s) of the General Specifications in accordance with which the work is tobe carried out.28.14 In the absence of specific directions to the contractor, the rates andprices inserted in the items are to be considered as the full inclusive rates andprices for the finished work described there under and are to cover all labourmaterials, wastage, temporary work, plant, overhead charges and profits, aswell as the general liabilities, obligations and risks arising out of the Generalconditions of contract.28.15 All measurements will made in accordance with the methods indicated inthe specification, and specification read in conjunction with the GeneralConditions of Contract.28.16 The details shown on drawings and all other information pertaining to thework shall be treated and provisional only and are liable to variation as foundnecessary while preparing working drawing which will be supplied by theGovernment during execution. The contractor shall not, on account of suchvariation be entitled to any increase over the ones quoted in the tender whichare on quantity basis.28.17 The recoveries if any from contractor will be effected as arrears of landrevenue through the Collector of the District.28.18 Protection of underground telephone cable and aerial telephone wiresand poles, transmission towers, electrical cables, and water supplying lines. Itwill therefore be the responsibility of the contractor to protect then carefully allsuch cases should be brought to the notice of the Engineer-in-charge by thecontractor and also the concerned department, any damage what so ever doneto these cables and pipe lines by the contractor shall be made good by him athis cost.28.19 Public Utilities:Action in respect of public utilities will be taken by the Contractor as envisagedin Clause 110 of Ministry’s Specifications for Road and Bridge work (2ndRevision).Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!