13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

128Dy.Ex. Engr.28.3 In case it becomes necessary for the due fulfillment of contract for theContractor to occupy land outside the Dept. Limits, the Contractor will have tomake his own arrangements with the land owners and to pay such rents if anyare payable as mutually agreed between them.The Department will afford the Contractor all the reasonable assistance toenable him to obtain Govt. Land for Such purpose on usual terms andconditions as per rules of Government.28.4 The special provision in detailed specifications or wording of any itemshall gain precedence over corresponding contradictory provision (if any) in thestandard specifications or P.W.D. Hand book where reference to suchspecifications is given without reproducing the details in contract.28.5 Suitable separating Barricades and enclosures shall be provided toseparate material brought by contractor and material issued by Government tocontractor under Schedule "A" Same applies for the material obtained fromdifferent sources of supply.28.6 It is presumed that the Contractor has gone carefully through theStandard Specifications of P.W.D. Hand Books and the Schedule of Rate of theDivision and studied the site condition before arriving at rates quoted by him.Decision of the Engineer-in-charge shall .be final as regards interpretation ofspecifications.28.7 The stocking a storage of construction material at site shall be in such amanner as to prevent deterioration or intrusion of foreign matter and to ensurethe preservation of their quality, properties and fitness of the work. Suitableprecautions shall be taken by the Contractor to protect, the material againstatmospheric actions, fire and other hazards. The materials likely to be carriedaway by wind shall be stored in suitable stores or with suitable barricades andwhere there is likely hood of subsidence of soil, such heavy materials shall bestored on approved platform.28.8 For Road and Bridge works, the contractor shall in addition to thespecifications cited here, comply with requirements of relevant I.R.C. Code ofPractice.28.9 The Contractor shall be responsible for making good the damages doneto the existing property during construction by his men.28.10 If it is found necessary from safety point of view to test any part of thestructure, the test shall be carried out by the Contractor with the help of theDepartment at his own cost.28.11 The contractor shall provide, maintain, furnish and remove oncompletion, temporary shed for office on work site for the use of ExecutiveEngineer's representative.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!