13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

125Dy.Ex. Engr.registers does not absolve the contractor of his contractual obligation towardsquality of the work.27.31 The contractor should ensure that all safety precautions are observed bythe labours while handling the materials and precautions. For their labour at thecost of the contractor and the contractor will bear all the expensescompensation etc. If any incident occur to the labour etc. no claim in this regardwhat-so-ever shall be entertained and the decision of the Department will befinal and conclusive.27.32 In case the materials become surplus owing to the change in the designof the work after the materials are brought by the contractor, no claim in thisregard will be entertained and the contractor will be required to take away suchmaterials from the site.27.33 The contractor should arrange for weighment of the bouzer if desired bythe Engineer in charge. The weighment shall be done in the presence ofrepresentative of the department at the cost of the contractor.27.34 The weight of the steel bars used on the work will be calculated on thebasis of standard weight per unit length vide IS. 1732. No wastage of steel willbe considered at all. Cut pieces of the steel irrespective of the length will be theproperty of the contractor and no claim whatsoever in this regard shall beentertained. The consignment of the steel brought by the contractor havingweight less than the standard weight per unit length of the bar as mentionedabove will not be accepted. For this purpose random sample will be tested bythe Executive Engineer and the decision of the Executive Engineer shall bebinding on the contractor, if the steel received is over weight (more thanstandard weight per running meter length) no extra payment will be made andno claim in this regard whatsoever shall be entertained27.35 No claims on account of cement or steel rods used for ancillary works onSite of- work shall be entertained.27.36 All the materials to be brought on site shall be brought only on workingdays and in presence of an authorized representative of the Engineer-in -charge.27.37 All the materials such as cement, mild steel, H.Y.S.D. Bars, TMT Barsetc. required for execution of work shall be brought by the contractor at his owncost.27.38 The contractor shall maintain the record of these materials (cement, steeletc.) in the prescribed proforma and registers as directed by Engineer-incharge.The sample of prescribed proforma is attached at the end. Theseregisters shall be signed by both the contractors and representative of theEngineer-in- charge. These registers shall be made available for inspection,Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!