13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

122Dy.Ex. Engr.this respect will be entertained later on. If the contractor or piece worker fails tosupply sufficient labour for the materials required at the time of measurementsor check measurements, after due notice has been given to him, the expensesincurred on account of employing department labour or material etc. shall becharged against his account.27.9 No deduction will made for voids.27.10 The materials shall not be Stacked in place where it is liable to bedamaged or lost due to traffic passing Over it, to be washed away by rain orfloods, to be buried under the landslides etc. or slip down an embankment orhill side etc. No claims for any loss due to these and similar causes will beentertained.27.11 Before stacking, the materials shall be free from all earth, rubbishvegetable matter and other extraneous substance and in the case of metal,screened to gauge, if so directed when ready. It shall be stacked entirely clearof the road way, on ground which has been cleaned of vegetation and leveled.On high banks, ghat roads etc. where it may not be practicable to stack itentirely clear of the roadway it may be stacked with the permission of theEngineer-in-charge on terms in such a way as to cause minimum danger andobstruction to the traffic or as may be directed by him.27.12 The size of the stacks for materials other than rubble shall be 3.00m x 1.50m x 0.80m or such other size as may be directed by the Engineer- in-chargeand all but one stack in 200 M. shall be of the same uniform size and shall beuniformly distributed over whole lengths. One stack (at the end) in each 200 Mmay be of length different from the rest in order to adjust total quantity to berequired but its width and height will be the same as those of the rest.27.13 The Sub Divisional Officer shall supply the Contractor with statementshowing furlong wise quantities that will be required and the order in which thecollection is to be done. No materials in excess of requirements in that furlongshall be stacked. Any excess quantity shall be removed at the expenses of theContractor or piece worker to where it is required before the material in thatfurlong is finally measured.27.14 In slacking materials the deposition shall commence at the end of the KMfastest from the quarry and be carried continuously to the other end (unlessotherwise directed by the Executive Engineer). Stacking in one 200 M shall becompleted before it is started in another, unless directed otherwise, in writing bythe Executive Engineer. Measurements of the materials stacked in a furlong willnot be recorded until the full quantity required has been stacked.27.15 All the materials such as asphalt, cement, steel etc. shall be procured bythe contractor from approved Government Institutions or as directed byEngineer in charge only. The materials shall be brought at the site of work wellSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!