13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

121Dy.Ex. Engr.and are inclusive of conveyance charges in respect of the leads and lifts. Noclaims on account of changes in lead will be entertained.27.5 No material shall be removed from the land within the road boundary orfrom the land touching it without the written permission of the Engineer- inchargeof his authorised agent. If any materials is un-authorised obtained fromsuch places the Contractor or piece worker shall have to make good thedamages and pay such compensation, in addition as may be decided by theExecutive Engineer and will have to stop further collection.27.6 Any material that falls on any P.W.D. Road from the cart etc. duringconveyance shall be immediately picked up and removed by the Contractor orpiece worker, failing which it will be got removed Departmentally at his cost. Noheap shall be left prior to checking even temporarily on the road surface or inany way so as to cause any obstruction or danger to the traffic. The Contractoror the piece worker shall be liable to pay for any claims of compensation etc.arising out of any accident, etc.Any such materials causing obstruction or danger etc. will be got removedDepartmentally at his cost and no claims for any loss or damage to thematerial, thus removed, will be entertained. The Contractor shall also beresponsible for the damage or accident etc. arising out of any material that fallson the road or track, not in charge of the Department and shall attend to anycomplaint which may be received otherwise authorised by Engineer in writing.Collection and spreading shall not be carried out at the same time in one andthe same mile or in to adjoin in Km. except with the return permission of theExecutive Engineer.27.7 Unless otherwise directed, the materials shall be collected in thefollowing orders availability of space :-1) Rubble (if included in tender)2) Metal3) Soft murum4) Hard murumShall be stacked on the side opposite for petty repairs and shall be stacked onthe side opposite to metal for new layer. Where metal for two layers has to bestacked as in the case of new roads, the metal for each layer shall be stackedon the opposite sides of the road.27.8 All road material shall be examined and measured before it is spread.The labour for measurements (and check measurements where ever carriedout) shall be supplied by the contractor or place worker. Immediately after themeasurements are recorded the stacks shall be marked by the contractor orpiece worker by who wash or otherwise as may be directed by the ExecutiveEngineer to prevent from any authorised tampering with the stacks. If thecontractor or piece worker fails to attend the measurements after receiving thenotice from Sub-divisional officer or his subordinate stating date and time of theintention to measure work, shall be measured nevertheless and no complaint inSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!