13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

120Dy.Ex. Engr.26.1 Unless separately provided for in the contract, the Contractor shall haveto make all necessary arrangements for regulating traffic, day to night duringthe period of construction to the entire satisfaction of the Engineer. Thisincludes the construction and maintenance of diversions if necessary. Thecontractor shall have to provide necessary caution board, barricades, flags,light and watchmen etc. So as to comply with the latest Motor Vehicles rulesand Regulation and for Traffic Safety and he shall be responsible for all claimsfrom accidents which may arise due to his negligence whether in regulating thetraffic or in stacking material on the roads, or due to any other reasons.26.2 It is to be clearly understood that whatever work carried out by theContractor for construction of diversion road including earthwork, W.B.M.bituminous surface dressing. R.C.C pipe drains etc. Will be paid for only once.If due to flow of traffic, due to floods or due to any other cause, this diversionroad and/or the R.C.C drain gets damaged it shall be repaired and maintainedby the Contractor in good condition till completion of the whole work at his ownexpenses.27. PROCUREMENT OF MATERIALS:-27.1 Where suitable and approved P.W. Department's quarries exist, theContractor or piece worker will be allowed if otherwise there is no objection toobtain the materials to the extent required for the work from the quarry. He willbe however, liable to pay compensation. If any damage is caused to the quarryeither deliberately or through negligence or for wastage of materials by himselfor his staff or labour.27.2 Where no suitable Government quarries exist or when the quantity ofthe material required cannot be obtained from a P.W. Department quarry theContractor or pieceworker shall make his own arrangements to obtain thematerial from existing or a new quarry in Government waste land, private landor land belonging to other States or Talukas, etc.After opening the quarry but before starting collection the quarry shall be gotapproved by the Engineer-in-charge or his representatives. The Contractor orpiece worker shall pay all royalty charges compensation etc. No claims orresponsibility on account of any of obstructions caused to execution of the workby difficulties arising out of private owners of land will be entertained.27.3 The rates in the tender include all incidental charges such as opening ofa new quarry, opening out a new portion in an existing quarry, removing top soiland the unsuitable material, dewatering a quarry, cost of blasting powder andfuse, lift, lead, repairs to existing cart tracks, making new cart tracks, controlcharges, Central/State Government or Municipal taxes, Local Boards, Cess,etc.27.4 The rates in the tender are for the delivery of the approved material onroad side properly stacked at the places specified by the Engineer-in- chargeSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!