13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

119Dy.Ex. Engr.25.6 The quarrying operations shall be carried out by the Contractor to theentire satisfaction of the Engineer-in-charge and the development of the quarryshall be made efficiently so as to avoid wastage of stones. Only such stones asare of the required quality shall be used on the work. Any stone such is in theopinion of the Engineer-in-charge, not in accordance with the specifications orof required quality will be rejected at any time, at the quarry or at the site ofwork. The rejected stones shall not be used on the work and such rejectedmaterials shall be removed to the place shown at the Contractor's cost.25.7 Since all stones quarried from Government quarry (if made available) bythe contractor including the excavated over burden are the property of theGovt. no stones or earth shall be supplied by the Contractor to any otheragencies or works are allowed to be taken away for any other works.All such surplus quarried materials not required for work under this contractshall be the property of the Govt. And shall be handed over by the Contractor toGovernment free of cost at quarry site duly heaped at the spots indicated bythe Engineer-in charge. The contractor will be entitled to the refund of royalty ifany, paid by him for such quantity handed over to Govt. for which necessarycertificate will be issued by Executive Engineer as per usual procedure, ifhowever, the Government does not required such surplus material thecontractor may be allowed to dispose off or such surplus material elsewherewith prior written permission of Engineer-in-charge. Leaving off a quarry face oropening of a new quarry face shall be done only on the approval of theEngineer-in-charge.25.8 Quarrying permission will have to be directly obtained by the Contractor,from the Collector of the District concerned for which purpose the departmentwill render necessary assistance. All quarry fees, royalty charges, octroi duties,ground rent for staking material etc. and charges shall be paid directly toRevenue Department by the contractor as per rules in force. If it is not paid bycontractor the same will be recovered from his bills.25.9 The contractor will be permitted to erect at his own risk and cost at thequarry site if suitable vacant space of Government area is available for thepurpose, his own structures for stores, offices etc. At places approved by theEngineer- in-charge. On completion of the work the contractor shall remove allthe structures erected by him and restore the site to its original condition.25.10 The Contractor shall not use any Sand in the quarry either for cultivationor for any other purpose except that required for breaking or stacking ortransporting stones.26 TRAFFIC REGULATION / ARRANGEMENT FOR TRAFFIC DURINGCONSTRUCTIONAction for arrangement for traffic during construction will be taken by theContractor as envisaged in the contract documents and spelt out in clause 112of MORTH Specification for Road and Bridge Work (2001)Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!