13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

118Dy.Ex. Engr.2 . The contractor shall make arrangement for all anti-malaria measures tobe provided for the labour employed on the work. The anti-maleria measureshall be provided as directed by the Assistant Director of Public Health.25. QUARRIES :-25.1 The quarrying operations shall be carried out by the Contractor withproper equipment such as compressors. Jack-hammers, drill bits, explosivesetc. and sufficient number of workmen shall be employed so as to get therequired out turn.25.2 The Contractor shall carry out the works in the quarries in conformitywith all the rules and regulations already laid down or may be laid down fromtime to time by Government. Any cost incurred by Government due to noncomplianceof any rules or regulations or due to damages by the contractorshall be the responsibility of the Contractor. The Engineer- in-charge or hisrepresentative shall be given full facilities by the Contractor for inspection at alltimes of the working of the quarry, records maintained, the stocks of theexplosives and detonators etc. so as to enable him to check that the workingrecords and storage are all in accordance with the relevant rule. The Engineerin-chargeor his representative shall at any time be allowed to inspect theworks, buildings, and equipment at the quarters.25.3 The Contractor shall maintain at its own cost, the book registers etc.required to be maintained under the relevant rules and regulations and asdirected by the Engineer-in-charge. These books shall be open for inspection atall times by the Engineer-in-charge or his representative and the Contractorshall furnish the copies or extracts of books or register as and when required.25.4 All quarrying operations shall be carried out by the Contractor inorganized and expeditious manner systematically and with proper planning.The Contractor shall engage licensed blaster and adopt electric blasting and/orany other approved method which would ensure complete safety to all the menengaged in the quarry and its surroundings. The Contractor shall himselfprovide suitable magazines and arrange to pre and store explosive etc. asrequired under the rules at his own cost. The designs and the location of themagazine shall be got approved in advance from the Chief Inspector ofExplosives and the rules and regulations in this connection as laid down by theChief Inspector of Explosives from' time to time shall be strictly adhered to bythe Contractor. It is generally experienced that it takes time to obtain thenecessary license for blasting & license for storage of material from theconcerned authorities. The contractor must therefore take timely advanceaction for procuring all such licenses so that the work progress may not behampered.25.5 The approaches to the quarrying place from the existing public roadsshall have to be arranged by the Contractor at his own cost, and the approachshall be maintained by the contractor at his own cost till the work is over.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!