116Dy.Ex. Engr.14) Providing full length gum boots, leather hand gloves with fire proofapron to cover the chest and back reaching upto knees and protective gogglesfor the eyes to the labourers working with hot asphalt handling vibrator incement concrete and also where use of any or all these items is beneficial inthe interest of health and well being of the labours in the opinion of theEngineer.20. EXPLOSIVES :-The Contractor shall at his own expense construct and maintain propermagazines, if such required for the storage of explosives for use in connectionwith the works, and such magazine, being situated constructed and maintainedin accordance with the Government Rules applicable in that behalf. Thecontractor shall at his own expenses obtain such Licenses as may benecessary for storage of explosives are approved by the Engineer, theGovernment shall not be incurring any responsibility whatever in connectionwith storage and use of explosives on the size or any accident or occurrencewhatsoever in connection therewith, all operations in or for which explosives aredeployed being at the risk of the contractor and upon his sole responsibility andthe contractor here by gives to Government an absolute indemnity in respectthereof.21. DAMAGE BY FLOODS OR ACCIDENTS :-The contractor shall take all precautions against damage by floods or like orfrom accident etc. No compensation will be allowed to the Contractor on thisaccount or for correcting and repairing any such damage to the work duringconstruction. The contractor shall be liable to make good at his cost any plantor materials belonging to the Government, lost or damaged by floods or fromany other cause which is in his charge.22. RELATION WITH PUBLIC AUTHORITIES :-The contractor shall comply with all rules, regulation, bye-laws and directiongiven from time also by any local public authority in connection with this workand shall himself pay fees or charges which are leviable on him without anyextra to the Department.23 POLICE PROTECTION: For the Special Protection of camp and thecontractor's works, the department will help the contractor as far as possible toarrange for such protection with the concerned authorities if so required by theContractor in writing. The full cost of such protection shall be borne by thecontractor.Signature of Contractor No. of corrections Executive Engineer
117Dy.Ex. Engr.24 MEDICAL AND SANITARY ARRANGEMENTS TO BE PROVIDEDFOR LABOUR EMPLDYED ON THE CONSTRUCTION BY THECONTRACTORa) The contractor shall provide an adequate supply of potable water for use oflabourers on work and in Camps.b) The contractor shall construct trench or semi permanent latrines for the useof the Labourers. Separate latrines shall be provided for men and women.c) The contractor shall build sufficient number of huts on a suitable plot of landfor use of the Labourers according to the following specifications :-1. Huts of Bamboos and Grass may be constructed.A good site not liable to submergence shall be selected on high ground remotefrom jungle but well provided with trees, shall be chosen where it is available.The neighborhood of tank, jungle, grass or woods should be particularlyavoided. Camps should not be established close to large cuttings of earth work.The lines of huts shall have open spaces of at least ten meters between rows.When a good natural site cannot be procured, particular attention should begiven to the drainage. There should be no overcrowding. Floor space at therate of 30 Sq.ft. Per head shall be provided. Care should be taken to see thatthe huts are kept clean and in good order.The Contractor must find his own land and if he wants Government land, heshould apply for it and pay assessment for it, if made available by Government.The contractor shall construct a sufficient number of bathing places. Washingplaces should also be provided for the purpose of washing clothes. TheContractor shall make sufficient arrangements for draining away the surfaceand sewage water as well as water from the bathing and washing places andshall dispose off this waste water in such way as not to cause any nuisance.The contractor shall engage a Medical officer with a traveling dispensary for aCamp containing- 500 or more persons if there is no Government or otherprivate dispensary situated within 8 kilometers from the Camp. In case ofemergency the contractor shall arrange at his cost for transport for quickmedical help to his sick worker.The Contractor shall provide the necessary staff for effecting a satisfactorydrainage system and cleanliness of the camp to the satisfaction of theEngineer. At least one sweeper per 200 persons should be engaged.The Assistant Director of Public Health shall be consulted before opening alabour camp and his instruction on matters such as water supply sanitaryconveniences, the camp site accommodation and food supply shall be followedby the Contractor.Signature of Contractor No. of corrections Executive Engineer
- Page 74 and 75: 66Dy.Ex.Engr.to the unexecuted part
- Page 76 and 77: 68Dy.Ex. Engr.P.W.D. ResolutionNo.
- Page 78 and 79: Contractor tosupply plant, ladder,s
- Page 80 and 81: 72Dy.Ex.Engr.l) When persons are em
- Page 82 and 83: 74Dy.Ex.Engr.Employment offemale la
- Page 84 and 85: 76Dy.Ex.Engr.and if they are not en
- Page 86 and 87: 78Dy.Ex.Engr.Claim for quantitiesen
- Page 88 and 89: Method ofpaymentAcceptance ofcondit
- Page 90 and 91: 82Dy.Ex.Engr.GovernmentCircular No.
- Page 92 and 93: 84Dy.Ex.Engr.( Telephone No. 022 -2
- Page 94 and 95: 86ADDITIONAL CONDITIONS FOR MATERIA
- Page 96 and 97: 88Dy.Ex. Engr.After completion of t
- Page 98 and 99: 90Dy.Ex. Engr.Accompaniments to Gov
- Page 100 and 101: 92Dy.Ex. Engr.consideration for pre
- Page 102 and 103: 94Dy.Ex. Engr.ADDITIONAL GENERAL CO
- Page 104 and 105: 96be known) under whose control the
- Page 106 and 107: 98Dy.Ex. Engr.iii) Between the quan
- Page 108 and 109: 100Dy.Ex. Engr.The Executive Engine
- Page 110 and 111: 102Dy.Ex. Engr.provided by the Depa
- Page 112 and 113: 104Dy.Ex. Engr.2) Auto CAD, non-aut
- Page 114 and 115: 10615.1 Frequency Chart for Testing
- Page 116 and 117: 108Dy.Ex. Engr.9. Open gradedpremix
- Page 118 and 119: 110Dy.Ex. Engr.13. InterlockingConc
- Page 120 and 121: 112Dy.Ex. Engr.binder content. All
- Page 122 and 123: any compensation on this behalf.114
- Page 126 and 127: 118Dy.Ex. Engr.2 . The contractor s
- Page 128 and 129: 120Dy.Ex. Engr.26.1 Unless separate
- Page 130 and 131: 122Dy.Ex. Engr.this respect will be
- Page 132 and 133: 124Dy.Ex. Engr.27.20 Any consignmen
- Page 134 and 135: 126Dy.Ex. Engr.verification for the
- Page 136 and 137: 128Dy.Ex. Engr.28.3 In case it beco
- Page 138 and 139: 13029. PAYMENTS AND MEASUREMENTS :-
- Page 140 and 141: 132Dy.Ex. Engr.32.2 The contractor
- Page 142 and 143: excepted Risk.134Dy.Ex. Engr.37. AD
- Page 144 and 145: 136Dy.Ex. Engr.2. The contractor ha
- Page 146 and 147: 138Dy.Ex. Engr.b) The base on which
- Page 148 and 149: 140Dy.Ex. Engr.free of oil and loos
- Page 150 and 151: 142+.Gòú. +ÊvÉEòÉ®úÒ SÉÉ
- Page 152 and 153: 144Dy.Ex. Engr.Extract from specifi
- Page 154 and 155: 146Dy.Ex. Engr.Rd.33.2 Road Diversi
- Page 156 and 157: 148Dy.Ex. Engr.plus 12 mm. For 25 m
- Page 158 and 159: Dy.Ex.Engr.Sr.NoName of Work :--Imp
- Page 160 and 161: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 162 and 163: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 164 and 165: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 166 and 167: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 168 and 169: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 170 and 171: Dy.Ex.Engr.Sr.NoQuantityEstimatedbu
- Page 172 and 173: Dy.Ex.Engr.1 2 3 4 53 Excavation fo
117Dy.Ex. Engr.24 MEDICAL AND SANITARY ARRANGEMENTS TO BE PROVIDEDFOR LABOUR EMPLDYED ON THE CONSTRUCTION BY THECONTRACTORa) The contractor shall provide an adequate supply of potable water for use oflabourers on work and in Camps.b) The contractor shall construct trench or semi permanent latrines for the useof the Labourers. Separate latrines shall be provided for men and women.c) The contractor shall build sufficient number of huts on a suitable plot of landfor use of the Labourers according to the following specifications :-1. Huts of Bamboos and Grass may be constructed.A good site not liable to submergence shall be selected on high ground remotefrom jungle but well provided with trees, shall be chosen where it is available.The neighborhood of tank, jungle, grass or woods should be particularlyavoided. Camps should not be established close to large cuttings of earth work.The lines of huts shall have open spaces of at least ten meters between rows.When a good natural site cannot be procured, particular attention should begiven to the drainage. There should be no overcrowding. Floor space at therate of 30 Sq.ft. Per head shall be provided. Care should be taken to see thatthe huts are kept clean and in good order.The Contractor must find his own land and if he wants Government land, heshould apply for it and pay assessment for it, if made available by Government.The contractor shall construct a sufficient number of bathing places. Washingplaces should also be provided for the purpose of washing clothes. TheContractor shall make sufficient arrangements for draining away the surfaceand sewage water as well as water from the bathing and washing places andshall dispose off this waste water in such way as not to cause any nuisance.The contractor shall engage a Medical officer with a traveling dispensary for aCamp containing- 500 or more persons if there is no Government or otherprivate dispensary situated within 8 kilometers from the Camp. In case ofemergency the contractor shall arrange at his cost for transport for quickmedical help to his sick worker.The Contractor shall provide the necessary staff for effecting a satisfactorydrainage system and cleanliness of the camp to the satisfaction of theEngineer. At least one sweeper per 200 persons should be engaged.The Assistant Director of Public Health shall be consulted before opening alabour camp and his instruction on matters such as water supply sanitaryconveniences, the camp site accommodation and food supply shall be followedby the Contractor.Signature of Contractor No. of corrections Executive Engineer