13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

116Dy.Ex. Engr.14) Providing full length gum boots, leather hand gloves with fire proofapron to cover the chest and back reaching upto knees and protective gogglesfor the eyes to the labourers working with hot asphalt handling vibrator incement concrete and also where use of any or all these items is beneficial inthe interest of health and well being of the labours in the opinion of theEngineer.20. EXPLOSIVES :-The Contractor shall at his own expense construct and maintain propermagazines, if such required for the storage of explosives for use in connectionwith the works, and such magazine, being situated constructed and maintainedin accordance with the Government Rules applicable in that behalf. Thecontractor shall at his own expenses obtain such Licenses as may benecessary for storage of explosives are approved by the Engineer, theGovernment shall not be incurring any responsibility whatever in connectionwith storage and use of explosives on the size or any accident or occurrencewhatsoever in connection therewith, all operations in or for which explosives aredeployed being at the risk of the contractor and upon his sole responsibility andthe contractor here by gives to Government an absolute indemnity in respectthereof.21. DAMAGE BY FLOODS OR ACCIDENTS :-The contractor shall take all precautions against damage by floods or like orfrom accident etc. No compensation will be allowed to the Contractor on thisaccount or for correcting and repairing any such damage to the work duringconstruction. The contractor shall be liable to make good at his cost any plantor materials belonging to the Government, lost or damaged by floods or fromany other cause which is in his charge.22. RELATION WITH PUBLIC AUTHORITIES :-The contractor shall comply with all rules, regulation, bye-laws and directiongiven from time also by any local public authority in connection with this workand shall himself pay fees or charges which are leviable on him without anyextra to the Department.23 POLICE PROTECTION: For the Special Protection of camp and thecontractor's works, the department will help the contractor as far as possible toarrange for such protection with the concerned authorities if so required by theContractor in writing. The full cost of such protection shall be borne by thecontractor.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!