13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

any compensation on this behalf.114Dy.Ex. Engr.19.2 INSPECTION:-The Contractor shall inform the Engineer-in-charge in writing -when any portionof the work is ready for inspection giving him sufficient notice to enable him toinspect the same without affecting the further progress of the work. The workshall not be considered to have been completed in accordance with the termsof the contract until the Engineer-in-charge shall have certified in writing to thateffect. Approval of materials or workmanship or approval of part of the workduring the progress of execution shall not bind the Engineer-in-charge or in anyway affect him even to reject the work which is alleged to be completed and tosuspend the issue of his certificate of completion until such alteration andmodifications or reconstruction have been effected at the cost of the Contractoras shall enable him to certify that the work has been completed to hissatisfaction.The Contractor shall provide at his cost necessary ladders and sucharrangements as to provide necessary facilities and assistance for properinspection of all parts of the work at his own cost.19.3 TEMPORARY QUARTERS:i) The contractor shall at his own expense maintain sufficient experiencedsupervisory staff etc. Required for the work and shall make his ownarrangement, provide housing for them with all necessary arrangements,including fire preventive measures etc. as directed by the Engineer-in- charge.ii) The contractor shall provide, furnish, maintain and remove oncompletion of the work, a suitable office on the work-site for the use ofExecutive Engineer's representative. The covered area for office exclusive ofvarandha should not be less than 24 Square Metre and height 3.0 meter It haveBrick masonry walls and asbestos or corrugated iron roof, paved floor shouldbe 18" above ground level. He should provide a basket type latrine, urinals andkeep them clean, daily. The contractor shall have provide Laboratory (with ref.books & I.S. codes) at site of size 6.0 m x 6.0m minimum and height 3.0 meterat work site. The office and Laboratory structures shall be semi-permanenttype. This will be supposed to be included in his rates.19.4 SAFETY MEASURES AND AMENITIES:While executing the work, necessary precautions regarding safety of labour,supervisory staff, public and traffic users shall be taken by the agencyaccording to rules and regulations specified by the Government of India /Government of Maharashtra and as directed by District Court, PuneSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!