13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

112Dy.Ex. Engr.binder content. All other tests shall be carried out by the contractor at his owncost. However the cost of testing of material as directed by Engineer-in-chargefor approving a particular material as laid down in para 15.2. (i) to (viii) will haveto be borne by the contractor.x) The contractor shall at his own cost arrange to carry out the routine testsof materials which are to be used on the work. The tests will have to be carriedout either in the field laboratory or in an approved laboratory.xi) Testing of the material used for this work should be carried out as perthe provisions made in Government Circular No. Miscellaneous /2004/PC-108/NH-2, dated 22/3/2005. Testing of material should be carried out as perfrequency stipulated by the Vigilance & Quality Control Circle. The contractorshould carry out 25% testing of material out of the total material required as perthe frequency from the Departmental Laboratory of Public Works Department.The payment for testing of material from the Departmental Laboratory shouldbe borne by the Contractor.xii) In case of materials procured by the contractor/testing as required by thecodes and specifications, the same shall be arranged by him at his own cost.Testing shall be done in the presence of an authorized representative of theEngineer-in-charge at the nearest laboratory. If additional testing other than asrequired by specification is ordered the testing charges shall be borne by thedepartment if the test results are satisfactory and by the contractor if the sameare not satisfactory.xiii) In case of materials supplied by the Government, if the contractordemands certain testing, the charges thereof shall be paid by the contractor ifthe test results are satisfactory and by the department if the same are notsatisfactory.15.3 The responsibility of assuring the quality of work shall be on thecontractor who shall take actions as stipulated in standard specification as per “Schedule C”15.4 It shall be responsibility of the contractor to achieve quality of work asstipulated in section 900 of MORTH Specification for Road and Bridge Work(2001)16. CO-ORDINATION:-When several agencies for different sub-work of the project are to worksimultaneously for the timely completion of the whole project smoothly, thescheduled dates for completion specified in each contract shall there-fore bestrictly adhered to. Each contractor may make his independent arrangement forwater, power, housing etc. If they so desire. On the other hand the contractorsare at liberty to mutual agreement in this behalf and make joint arrangementsSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!