105Dy.Ex. Engr.liability of the Contractor for guarding, maintaining and making good any damages ofany magnitude interim payments made for such work will not alter this position. Thehanding over by the Contractor and taking over by the Executive Engineer or hisauthorized representative will be always in writing, copies of which will go to theExecutive Engineer or his authorized representative and the contractor. It is, howeverunderstood that before taking over such work, Government will not put it into regularuse as distance from casual or incidental one, except as specially mentionedelsewhere in this contact, or as mutually agreed to.14. ASSISTANCE IN PROCURING PRIORITIES, PERMITS ETC. :-The Engineer, on a written request by the contractor, will if in his opinion, the requestis reasonable and in the interest of work and its progress, assist the contractor inSecuring, the priorities for deliveries, transport permits for controlled materials etc.,where such are needed. The Government, will not, however be responsible for thenon-availability of such facilities or delay in this behalf and no claims on account ofsuch failures or delays shall be allowed by the Government. The Contractor shall haveto make his own arrangement for machinery required for the work. Such machineryconveniently available with the Department may be spared as the rules in force onrecovery of necessary Security Deposit and rent with Agreement in the prescribedSignature of Contractor form. Such an Agreement shall be independent of thiscontract and the supply of machinery shall not form a ground for any claim orextension of time limit for this work.15. A) The Contractor shall set up and get it checked and certified by the ExecutiveEngineer, a field laboratory with necessary equipments for testing of all materials,finished products used in the construction as per requirements of relevantspecifications. The testing of all materials shall be carried out by the Engineer, or hisrepresentative for which the contractor shall make all the necessary arrangementsand bear the entire cost.B) At least 30% of the tests of those required as per frequency chart given inClause 15.1 shall be carried out in Government Laboratories of Vigilance & QualityControl Circle. All the tests which cannot be carried out in field laboratory shall becarried out 100% at the contractor's cost in Vigilance & Quality Control laboratory.C) The tests which cannot be carried out both in field laboratory and Vigilance &Quality Control Circle's laboratories shall be carried out 100% in the laboratories ofGovernment Engineering College / Government Polytechnic at the entire cost ofContractor.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!