13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

104Dy.Ex. Engr.2) Auto CAD, non-auto CAD base software to deliver desired outputs based on surveycarried out using (1) above, in printed/soft copy as instructed by engineer in charge.3) Necessary trained manpower to work on and deliver as (1) and (2) above.For appointing survey agency, to carry out such surveys and deliver desired outputs inprinted/soft as instructed by engineer in charge as mentioned above the Contractorshall not be paid separately. His offer shall be inclusive of all.11) AUTHORITIES OF THE ENGINEER-IN-CHARGE REPRESENTATIVEThe duties of the representative of the Engineer-in-charge are to watch and supervisethe work and to test and examine any material to be used or workmanship employedin connection with the works.The Engineer-in-charge may from time to time, in writing delegate to hisrepresentative any powers and authorities vested in the Engineer-in-charge and shallfurnish to the Contractor a copy of all such delegations of powers and authorities. Anywritten instructions of Approval given by the representative of the Engineer-in-chargeto the Contractor within the terms of such" delegations (but not otherwise) shall bindthe Contractor and the department as through it had been given by the Engineer-incharge, provided always as follows.Failure of the representative of the Engineer-in-charge to disapprove any work ormaterials shall not prejudice the power of the Engineer-in-charge thereafter todisapprove such work or materials and so order the putting down, removal or breakingup thereof.12) INITIAL MEASUREMENTS FOR RECORDWhere for proper measurement of the work, it is necessary to have an initial set oflevels or other measurements taken, the same as recorded in the authorized fieldbook or measurement book of Government by the Engineer or his authorizedrepresentative will be signed by the contractor who will be entitled to have a true copyof the same made at his cost. Any failure on the part of the contractor to get suchlevels etc. Recorded before starting the work, will render him liable to accept thedecision of the Engineer as to the basis of taking measurements.Like-wise the contractor will not cover any work which will render its subsequentmeasurements difficult or impossible without first getting the same jointly measured byhimself; and the authorized representative of the Executive Engineer. The record ofsuch measurements on the Government side will be signed by the Contractor and hewill be entitled to have a true copy of the same made at his cost.13 HANDING OVER OF WORK:-All the work and materials before finally taken over by Government will be the entireSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!