101Dy.Ex. Engr.Priorities for items to be executed shall be determined periodically keeping in view ofthe final time limit allowed for the work and all the time schedule fixed for intermediatestages of work.7.6 Revised Programme of Work in case of slippage:In case of slippage from the approved work programme at any stage, the contractorshall furnish revised programme to make up slippage within the stipulated timeschedule and obtain the approval of the Engineer-in-charge to the revisedprogramme.7.7 Action in case disproportionate progress:In case of extremely poor progress of the work or any item at any stages of workwhich in the opinion of the Engineer-In-Charge cannot be made good by theContractor considering his available resources, the Engineer-In-Charge will get itaccelerated to make up the lost time through any other agency, and recover theadditional cost incurred, If any, in getting the work done from the Contractor afterinforming him about the action envisaged by him.8. TREASURE-TROVE:In the event of discovery by the contractor or his employees, during the progress ofthe work of any treasure, fossils, minerals or any other articles of value or interest, thecontractor shall give immediate intimation thereof to the Engineer and forthwith handover to the Engineer such treasure or things which shall be the property ofGovernment.9. AGENT AND WORK-ORDER BOOK:The contractor shall himself manage the work or engage an authorized all-time agenton the work capable of managing and guiding the work and under standing thespecifications and contract condition. A qualified and experience, Engineer shall beprovided by the Contractor as his agent for technical matters in case the Engineer-in--charge considers this as essential for the work and so directs contractors. He will takeorders as will be given by the Executive Engineer or his representative and shall beresponsible for carrying them out. This agent shall not be changed without priorintimation to the Executive Engineer and his representative on the work site. Thecontractor shall supply to the Engineer the details of all supervisory and other staffemployed by the Contractor and notify changes when made, and satisfy theunquestionable right to ask for change in the quality and numbers of contractor'ssupervisory staff and to order removal from work of any of such staff. The contractorshall comply with such orders and effect replacements to the satisfaction of theEngineer.A work-order book shall be maintained on site and it shall be the property ofGovernment and the Contractor shall promptly sign orders given therein by ExecutiveEngineer or his representative and his superior officers, and comply with them. Thecompliance shall be reported by the contractor to the Engineer in good time so that itcan be checked. The blank work order book with machine numbered pages will beSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!