13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

100Dy.Ex. Engr.The Executive Engineer shall remain present and personally supervise the first 200mtrs. length, accordingly in presence of Deputy Engineer, Junior Engineer andContractor/Contractor’s representative. The Deputy Engineer shall remain present andpersonally supervise at least 25% of the area of seal coat executed, The JuniorEngineer shall remain present and personally supervise cent percent length executed.The Executive Engineer shall show the check measurement of carpet and liquidseal coat accordingly in the measurement book for the executed 200 Mtrs. demolength. This check measurement shall be part of percentage check measurementrequired by Executive Engineer as per the Maharashtra Public Works Manual,Appendix-24.The measurement of liquid seal coat of the work shall be recorded by DeputyEngineer only.7. PROGRESS SCHEDULE:7.1 The contractor shall furnish within the period stipulated in writing by theEngineer-in-charge, of the order to start the work, a progress schedule inquadruplicate indicating the date of actual start, the monthly progress expected to beachieved and the anticipated completion date of each major item of work to be doneby him, also indicating dates of procurement and setting up of materials, plant andmachinery. The schedule is to be such as is practicable of achievement towards thecompletion of the whole work in the time limit, the particular items, if any, on the duedates specified in the contract and shall have the approval of the Engineer-in-charge.No revised schedule shall be operative without such acceptance in writing. TheEngineer is further empowered to ask for more detailed schedule or schedules sayweek by week for any item, in case of urgency of work as will be directed by him andthe contractor shall supply the same as and when asked for.7.2 The Contractor shall furnish sufficient plant, equipment and labour as may benecessary to maintain the progress of schedule. The working and shift hour'srestricted to one shift a day for operations to be done under the Governmentsupervision shall be such as may be approved by the Engineer-in-charge. They shallnot be varied without the prior approval of the Engineer. Night work which requiressupervision shall not be permitted except when specifically allowed by Engineer eachtime, if requested by the Contractor. The Contractor shall provide necessary lightingarrangements etc. For night work as directed by Engineers without extra cost.7.3 Further, the contractor shall submit the progress report of work in prescribedforms and charts etc. At periodical intervals, as may be specified by the Engineer-incharge.Schedule shall be in form of progress charts, forms, progress statementand/or reports as may be approved by the Engineer.7.4 The contractor shall maintain proforma, charts, details regarding machinery,equipment, labour, materials, personnel etc. As may be specified by the Engineer andsubmit periodical returns thereof as may be specified by the Engineer-in-charge.7.5 PRIORITIES OF WORKS TO BE EXECUTED:Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!