13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

98Dy.Ex. Engr.iii) Between the quantities shown in schedule of quantities and thosearrived at from the drawings, the latter shall be preferred.iv) Between the written description of the item in the schedule of quantitiesand the detailed description in the specifications of the same items, the latter shall beadopted.(b) In case of difference between the rates written in figures and words, the rateadopted by the contractor for working out the total amount of the item will be taken ascorrect. In other cases correct rate would be that, which is lower.(c ) In all cases of omissions and / or doubts or discrepancies in the dimensionsor description of any item or specification, reference shall be made to the ExecutiveEngineer, Public Works (South) Division, Pune whose elucidation, elaboration ordecision shall be considered as authentic. The contractor shall be held responsible forany errors that may occur in the work through lack of such reference and precaution.(d) The special provisions in detailed specifications and wording of any itemshall gain precedence over corresponding contractor provisions (if any) in thestandard specifications of public works department Hand Book where reference tosuch specifications is given without reproducing the details of contract.5. METHODOLOGY OF CONSTRUCTION AND CONSTRUCTIONEQUIPMENTS :-5.1 Construction Machinery / Equipments:5.1.1 The methodology and equipments to be used on the project shall be furnishedby the Contractor to the Engineer-In-Charge well in advance of commencement ofwork and approval of the Engineer-In-Charge obtained prior to its adoption and use.5.1.2 The Contractor shall give, a trial run of the equipment for establishing itscapability to achieve the laid down specifications and tolerance to the satisfaction ofthe Engineer-in-Charge before commencement of work, if so desired by the Engineer-In-Charge.5.1.3 All equipments provided shall be of proven efficiency and shall be operated andmaintained at all times in the manner acceptable to the Engineer-In-Charge.5.1.4 No equipment or personnel shall be removed from the site without permissionof the Engineer-In-Charge .5.2 Contractor shall furnish at least 15 days in advance his programme ofcommencement of item of work, the details of actual methods that would be adoptedby the contractor for the execution of various items of work such as well sinking, castin-situ,superstructure for bridge work items etc. for bridge works supported bynecessary detailed drawings and sketches including those of the plant and machinerythat would be used, their locations, arrangements for conveying and handlingSignature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!