13.07.2015 Views

View Tender Document - e-Tendering

View Tender Document - e-Tendering

View Tender Document - e-Tendering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

97Dy.Ex. Engr.Contract or part (s) thereof as the case may be and shall include all extra, additional,altered or substituted works as required for performance of the Contract.The "Contract Sum" shall mean the sum for which the tender is accepted.0) The "Accepting authority" shall mean the officer competent to accept thetender. The "Accepting Authority" shall mean the Superintending Engineer, PublicWorks Circle, Pune.P) The "Day" shall means a day of 24 hours from midnight to midnight irrespectiveof the number of hours worked in any day in that week.Q) "Temporary Works" shall means all temporary works of every kind required inor about the execution completion or maintenance of the work.R) "Urgent Works" shall means any measure which in the opinion of the Engineer-In-charge become necessary during the progress of the works to obviate any risk oraccident or failure or which become necessary for security of the work or the personsworking thereon.S) A "Week" shall means seven consecutive days without regards to the numberof hours worked on any day in that week.T) "Excepted Risks" are risks to riots (other wise than among contractorsemployees) and civil commotions (in so far as both these are uninsurable) war(whether declared or not) invasion, act of foreign enemies, hostilities, civil war,rebellion, revolution, insurrection, lightening and unprecedented floods over which thecontractor has no control and accepted as such by the accepting authority. Where thecontext so requires, words importing the singular number only also include the pluralnumber and vice-versa.Heading and Marginal notes if any to the general condition shall not be deemed toform par thereof or be taken into consideration in the interpretation or constructionthereof the contract.Wherever, there is mention of "Schedule of Rates" of the division or simply D.S.R. ofschedule rates in this tender, it will be taken to mean as "The schedule of rate of theDivision in whose jurisdiction the work lies"4. ERRORS, OMISSION AND DISCREPANCIES:(a) In case of errors, omissions and / or disagreement between written andscaled dimensions on the drawing or between drawings and specifications etc. Thefollowing order of preference shall apply.i) Between actual scaled and written dimensions or descriptions on adrawing the latter shall be adopted.ii) Between the written or shown description of dimensions in the drawingand corresponding one in the specifications, the latter shall apply.Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!