92Dy.Ex. Engr.consideration for prevailing quarter preceding the month in which the lastdate prescribed for receipt of tender, falls which is higher.(5) Formula for TMT/ HYSD and Mild Steel ComponentV 5 = { S 0 ( SI 1 - SI 0 ) } x T where,SI 0V 5 = Amount of price variation in Rupees to be allowed for TMT/ HYSD/ MildSteel component.S 0 = Basic rate of TMT/ HYSD/ Mild Steel in rupees per metric tonne asconsidered for working out value of P.SI 1 = Average Steel Index as per RBI Bulletin during the quarter underconsideration..SI 0 = Average Steel index as per RBI Bulletin during the quarter preceding themonth in which the last date prescribed for receipt of tender, falls.T = Tonnage of Steel used in the permanent works for the quarter underconsideration.(6) Formula for Cement ComponentV 6 = { C 0 ( CI 1 - CI 0 ) } x T where,CI 0V 6 = Amount of price escalation in Rupees to be allowed for Cementcomponent.C 0 = Basic rate of Cement in rupees per metric tonne as considered forworking out value of P..CI 1 = Average Cement Index published in RBI Bulletin for the quarter underconsideration..CI 0 = Average Cement index published in RBI Bulletin for the quarterpreceding the month in which the last date prescribed for receipt oftender, falls.T = Tonnage of Cement used in the permanent works for the quarterunder Consideration.(7) Formula for C.I. / D.I. Pipe ComponentV 7 = Q 0 x ( D 1 - D 0 )where,V 7 = Amount of price escalation in Rupees to be allowed for C.I./D.I. Pipecomponent.D 0 = Pig iron basic price in rupees per metric tonne as considered for workingout value of P.D 1 = Average Pig Iron price in rupees per tonne during the quarter underconsideration ( Published by HSCO) .Q 0 = Tonnage of C.I./D.I. Pipes used in the permanent works for the quarterunder Consideration..Signature of Contractor No. of corrections Executive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!