5 Commissioning and Testing5.4 Filling the Domestic Hot Water Circuit (Combi Boiler Only)a) Open the DHW inlet valve.b) Open all DHW taps in turn to vent any air from the DHW pipework.5.5 Filling the Siphon with WaterFig 5/Ca) Remove the retaining clip and siphon (A)b) Fill the siphon with water.c) Fit siphon (A) and secure with the retaining clip5.6 Commissioning the Boilera) If a clock thermostat is fitted, check that the jumper between ‘L and 1’on plug96 has been removed. (Figure 4/M).b) Lower the control box by detaching the two plastic clips at each end of thecontrol and rotating the control box forwards (see section 4.9)NOTE: The boiler is supplied for use on Natural Gas (G20). If the boiler is to beused on LPG Propane (G31) follow the instructions supplied with the relevantconversion kit before commissioning the boiler.c) Refer to Figure 5/D. Loosen the screw (A) and connect a pressure gauge tothe inlet pressure test point on the gas valve. Ensure the room thermostat iscalling for heat, turn on the gas supply and light the boiler and any otherappliances served by the gas pipe. When commissioning the boiler for use onNatural Gas (G20) check that the inlet pressure is 20±1 mbar (8 in.wg).40
5 Commissioning and Testing5.6 Commissioning the Boilerd) Remove the pressure gauge. Tighten the inlet pressure test point screw.e) Restart the appliance and check for leakage of gas from the pressure test nipple.Fig 5/D: Gas ControlFigure 5/E: Flue Gas SamplingVitodens 200 is set up in the factory for natural gas and can be converted to LPG Propane usinga conversion kit. During commissioning or after maintenance the CO2 level can be checked atthe boiler flue adaptor position (A) as illustrated in Figure 5/E.Subject to Wobbe index, the CO2 content fluctuates between:7.4% to 10.5% for natural gas8.5% to 11.0% for LPG PropaneCompare the actual CO2 value measured at position (A) with the above CO2 value ranges for theindividual gas groups. If the actual CO2 value deviates by more than 1% for natural gas or 0.5%for LPG, proceed as follows:-Check that the correct gas restrictor has been fitted.Check the balanced flue system for soundness.41
- Page 1 and 2: VITODENS 200 WB2AINSTALLATION & SER
- Page 3 and 4: 1 General Information1.1 Appliance
- Page 5 and 6: 2 Technical Specifications2.2 Gener
- Page 8 and 9: 2 Technical Specifications2.6 Hydra
- Page 10 and 11: 3 Installation Requirements3.1 Stat
- Page 12 and 13: 3 Installation RequirementsPosition
- Page 14 and 15: 3 Installation Requirements3.4 Vent
- Page 16 and 17: 3 Installation RequirementsFigure 3
- Page 18 and 19: 3 Installation Requirements3.5 Cent
- Page 20 and 21: 3 Installation Requirements3.7 Gas
- Page 22 and 23: 4 Installation ProcedureFigure 4/A:
- Page 24 and 25: 4 Installation Procedure4.2.2 Fitti
- Page 27 and 28: 4 Installation ProcedureFigure 4/E:
- Page 29 and 30: 4 Installation Procedure4.7.2 Verti
- Page 31 and 32: 4 Installation Procedure4.8.2 Verti
- Page 33 and 34: 4 Installation Procedure4.9.1 Elect
- Page 35 and 36: 4 Installation Procedure4.11 Conden
- Page 37 and 38: 5 Commissioning and Testing5.1 Fill
- Page 39: 5 Commissioning and Testing5.3 Vent
- Page 43 and 44: 5 Commissioning and Testing5.9 Fina
- Page 45 and 46: 6 Routine Servicing6.1 Routine Serv
- Page 47 and 48: 6 Routine Servicing6.4 Combustion C
- Page 49 and 50: 6 Routine Servicing6.8 Re-commissio
- Page 51 and 52: 8 Fault FindingIt is the law that a
- Page 53 and 54: 9 Replacement of PartsBefore commen
- Page 55 and 56: 9 Replacement of Parts9.3 Burnera)
- Page 57 and 58: 9 Replacement of Parts9.7 Air Press
- Page 59 and 60: 9 Replacement of Parts9.10 Limit Th
- Page 61 and 62: 9 Replacement of Parts9.13 CH Therm
- Page 63 and 64: 9 Replacement of Parts9.16 DHW Heat
- Page 65 and 66: 9 Replacement of Parts9.17 DHW Flow
- Page 67 and 68: 9 Replacement of Parts9.21 Pressure
- Page 69 and 70: 9 Replacement of Parts9.23 Expansio
- Page 71 and 72: 10 Replacement Parts001 Quick Actin
- Page 73 and 74: 10 Replacement Parts004 Temperature
- Page 75: 11 Index6 . . . . . . . . . . . . .
5 Commissioning and Testing5.4 Filling the Domestic Hot Water Circuit (Combi Boiler Only)a) Open the DHW inlet valve.b) Open all DHW taps in turn to vent any air from the DHW pipework.5.5 Filling the Siphon with WaterFig 5/Ca) Remove the retaining clip and siphon (A)b) Fill the siphon with water.c) Fit siphon (A) and secure with the retaining clip5.6 Commissioning the Boilera) If a clock thermostat is fitted, check that the jumper between ‘L and 1’on plug96 has been removed. (Figure 4/M).b) Lower the control box by detaching the two plastic clips at each end of thecontrol and rotating the control box forwards (see section 4.9)NOTE: The boiler is supplied for use on Natural Gas (G20). If the boiler is to beused on LPG Propane (G31) follow the instructions supplied with the relevantconversion kit before commissioning the boiler.c) Refer to Figure 5/D. Loosen the screw (A) and connect a pressure gauge tothe inlet pressure test point on the gas valve. Ensure the room thermostat iscalling for heat, turn on the gas supply and light the boiler and any otherappliances served by the gas pipe. When commissioning the boiler for use onNatural Gas (G20) check that the inlet pressure is 20±1 mbar (8 in.wg).40