13.07.2015 Views

Reson Seabat 8101

Reson Seabat 8101

Reson Seabat 8101

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

InstallationPrior to installation, consideration should be given to the following items.• The Sonar Processor should be located in an area that is not exposed to theweather but within the 25 meter length of the interconnection cable. If a longercable is required, contact RESON engineering. This unit may be rack or tablemounted in the general vicinity of the operator; close enough to allow easyaccess to the front panel On/Off switch and to allow the connection of theTrackball and Monitor cables. Note that the trackball can be connected to eitherthe front or rear panel of the Sonar Processor.• The Sonar Processor to Sonar Head Signal and Control Cable should berouted with no tight bends (see paragraph 2.4.5.2) or strain on either connector,away from sharp edged metal structures, and sufficiently protected fromfoot traffic. Do not stretch this cable to make a connection. If necessary, movethe equipment to allow a strain-free connection.• The Sonar Head must be securely mounted in a relatively turbulence freearea and as far away from any hull mounted machinery as possible. If themounting device is a moveable or retractable pole, care should be taken tominimize any Sonar Head motion due to bending or vibration of the pole. Inaddition, verify that the pole attachment hardware is not a source of rattling,or other mechanical noise. Another consideration in placement of the head, isthe 25 meter length of the cable to the Sonar Processor. If a longer cable isrequired, contact RESON engineering.• The Color Video Monitor and Trackball are the primary tools for the operatorand should be located in a reasonably comfortable work area with a suitableflat surface to allow access to operating logs, and note books.1. Place the monitor on a surface that allows a comfortably seated operator toview the screen at a 10 to 40 degree downward angle. Allow adequate aircirculation to prevent internal heat build-up. Do not place the monitor on surfaces(rugs, blankets, etc.) or near material (curtains, draperies) that mayblock the ventilation openings.2. Do not install the monitor in a location near heat sources such as radiators orair ducts, or in a place subject to direct sunlight, excessive dust, mechanicalvibration, salt spray, or shock.3. Use equipment straps, clamps, or other securing devices to ensure that theinstallation is seaworthy.2.4.1 General Installation GuidelinesThe sonar head is supplied with a full set of installation drawings intended for usein fabricating unique mounting hardware is provided in Chapter 9 of this manual.If the mounting structure is movable, such as an over-the-side pole, use care inpositioning the sonar head to sonar processor cable to avoid damage when mov-______________________________________________________________________SeaBat <strong>8101</strong> Operator's Manual 2-3 Version 3.02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!