13.07.2015 Views

2002 - cesnet

2002 - cesnet

2002 - cesnet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 6 12 18 24 30requirements analysisWP0 0.10.20.3D0functional arch. design system arch. design enhanced architecture next generation arch.WP1 1.1D1.11.21.3D1.21.4D1.3D1.4application developmentWP2WP3WP42.12.22.32.43.13.23.33.44.14.2D2.1D2.3experiment definition experiment infrastructure setup assessment of components and arch.D3.1 D3.2project coordination, dissemination and external coordinationD4.1D2.2D4.2D3.3Figure 12.3: SCAMPI project time scheduleD3.4 D3.5D4.3 D4.412.5 CESNET Participation in theSCAMPI ProjectThe total amount of work on the project and the amount of work on the projectof every partner are expressed in man-months (MM). The planned distributionof these man-months up to the level of individual WP tasks for every partner isincluded in the basic document that describes the project (Work Description).Furthermore, one partner is appointed as the leader of each WP. In a similarway, a responsible partner for every document or other output is defined.The share of CESNET is 34 MM of the total number of 483. We are involved in allWPs but the focus of our work lies in WP3. CESNET is the leader of WP3 and isresponsible for documents D3.2 and D3.4.12.6 Project Progress in <strong>2002</strong>The project started at the beginning of April. According to the time schedule,four documents (D0.1, D0.2, D1.1, and D3.1) were elaborated in <strong>2002</strong> (i.e., duringfirst 9 months of the project work). However, soon after the project began,High-speed National Research Network and its New Applications <strong>2002</strong>149

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!