Guidance on Environmental Management Plans

Guidance on Environmental Management Plans

Guidance on Environmental Management Plans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Decommissi<strong>on</strong>ing Envir<strong>on</strong>. <strong>Management</strong> Plan (DEMP)When is a DEMP required?As a general guideline, a DEMP is usually required during thedecommissi<strong>on</strong>ing phase of:• Projects originally required to submit an EIA• Projects involving buildings c<strong>on</strong>taminated with asbestos materialsand/or lead-based paint• Projects involving the removal of organic liquids, hazardous materials orhazardous wastes• Projects generating in excess of 100 m 3 in volume of waste• Projects in which more than 50% of exterior walls are demolished• Projects in which the land areas is greater than 2,000 m 2• Project sites in which residual impacts may pose a threat to theenvir<strong>on</strong>ment or in which c<strong>on</strong>taminati<strong>on</strong> levels exceed regulatory limits.However, applicati<strong>on</strong>s are reviewed <strong>on</strong> a case-by-case basisThe DEMP must be submitted to EAD for approval prior tothe scheduled commencement of decommissi<strong>on</strong>ing 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!