13.07.2015 Views

final report of a mission carried out in brazil from 15 to 24 march ...

final report of a mission carried out in brazil from 15 to 24 march ...

final report of a mission carried out in brazil from 15 to 24 march ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The <strong>mission</strong> team noted that at least one RASFF notification <strong>from</strong> 2007 (2007.BUB) concern<strong>in</strong>g <strong>in</strong>shellBrazil nuts had not been followed up. Accord<strong>in</strong>g <strong>to</strong> the representatives <strong>of</strong> DIPOV, it hadreceived no such notification <strong>from</strong> DNSF, so no follow-up had been conducted. 7ConclusionsThere are adm<strong>in</strong>istrative structures and procedures <strong>in</strong> place for RASFF follow-up with<strong>in</strong> MAPA.However, the procedure does not always ensure that all RASFF notifications concern<strong>in</strong>g Brazil nutsare <strong>in</strong>vestigated.5.9 RESEARCH ACTIVITIESF<strong>in</strong>d<strong>in</strong>gsS<strong>in</strong>ce the previous <strong>mission</strong>, SANCO/7074/2004, several research projects focus<strong>in</strong>g on goodagricultural practices (GAP), GMP and good s<strong>to</strong>rage practices (GSP) have been <strong>in</strong>itiated andcompleted, with some concrete recommendations made on how <strong>to</strong> improve the quality <strong>of</strong> nuts.These projects <strong>in</strong>clude the Conforcast project (implemented s<strong>in</strong>ce 2005) and the SAFENUT project(implemented between 2006 and 2008). Accord<strong>in</strong>g <strong>to</strong> the CCA the results <strong>of</strong> Conforcast show that<strong>in</strong>fluence <strong>of</strong> rotten nuts on the contam<strong>in</strong>ation level, be<strong>in</strong>g one <strong>of</strong> the conclusions that the removal <strong>of</strong>rotten nuts br<strong>in</strong>gs drastic reduction <strong>to</strong> the percentage <strong>of</strong> non-compliant samples (1.9% at the level <strong>of</strong>20ppb, 3.8% at the level <strong>of</strong> <strong>15</strong>ppb and 5.7% at the level <strong>of</strong> 10ppb).The <strong>mission</strong> team noted dur<strong>in</strong>g the on-site visits <strong>to</strong> the collec<strong>to</strong>r community and nut processors thatsome <strong>of</strong> the recommendations made <strong>in</strong> these projects have already been implemented, such asdifferentiation <strong>in</strong> the prices paid <strong>to</strong> collec<strong>to</strong>rs for Brazil nuts depend<strong>in</strong>g on product quality <strong>to</strong>encourage them <strong>to</strong> pay more attention <strong>to</strong> quality. The <strong>mission</strong> team was <strong>in</strong>formed that additionalstudies are necessary <strong>in</strong> order <strong>to</strong> assess the possibility <strong>to</strong> implement GAP, GMP and GSPrecommendations <strong>in</strong> practice. A further 3 projects are therefore currently be<strong>in</strong>g implemented, <strong>in</strong>particular <strong>to</strong> study the implementation <strong>of</strong> traceability dur<strong>in</strong>g the transport <strong>of</strong> Brazil nuts <strong>from</strong>collec<strong>to</strong>r communities <strong>to</strong> processors, <strong>to</strong> exam<strong>in</strong>e technological <strong>in</strong>novations such as br<strong>in</strong>g<strong>in</strong>g dry<strong>in</strong>gfacilities closer <strong>to</strong> collec<strong>to</strong>r communities, and <strong>to</strong> better understand myco<strong>to</strong>x<strong>in</strong> growth through<strong>out</strong> theBrazil nut production cha<strong>in</strong>.ConclusionsS<strong>in</strong>ce the last <strong>mission</strong>, progress have been made <strong>in</strong> the research activities on Brazil nuts. Severalresearch projects focus<strong>in</strong>g on good practices have been <strong>in</strong>itiated and completed with some concreterecommendations on how <strong>to</strong> improve the quality <strong>of</strong> nuts. However, further efforts need <strong>to</strong> made <strong>in</strong> order <strong>to</strong>implement identified good practices.5.10 FOLLOW-UP TO MISSION 7074/2004The current status <strong>of</strong> the recommendations made <strong>in</strong> 2004 are summarised <strong>in</strong> the follow<strong>in</strong>g table:Recommendation made <strong>in</strong><strong>report</strong> 7074/2004(1) Ensure that already draftedexport and sampl<strong>in</strong>g procedures<strong>of</strong> Brazil nut consignments<strong>in</strong>tended for export <strong>in</strong><strong>to</strong> the EUare enforced at the earliestSummary action described byMAPAIn order <strong>to</strong> guarantee cus<strong>to</strong>mscontrols on Brazil nuts, theconsolidation <strong>of</strong> the measuresrequired for the control procedurehas been completed. These measuresFVO commentLegislation for exportcontrol <strong>of</strong> Brazil nuts byMAPA has beenestablished s<strong>in</strong>ce last<strong>mission</strong>, but it is7 In their response <strong>to</strong> the draft <strong>report</strong> the Brazilian Authorities noted that mentioned RASFF notification was not<strong>of</strong>ficially received by MAPA. However, the <strong>in</strong>vestigation is currently ongo<strong>in</strong>g.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!