13.07.2015 Views

CHS Installation Manual - Chromalox Precision Heat and Control

CHS Installation Manual - Chromalox Precision Heat and Control

CHS Installation Manual - Chromalox Precision Heat and Control

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OPERATION (cont’d.)Now turn the wheel on the large timer until the “off” tab passes the“time now” arrow. The “boiler normal” light should go out <strong>and</strong> thevalve should begin to open. Once the “valve open” light goes on, thevalve should remain open for a few seconds <strong>and</strong> then automaticallyclose. The “drain valve closed” light should light <strong>and</strong> the “boiler normal”light should remain off.NORMAL OPERATION – Set the “Boiler Normal/24-hour duty”switch located on the inside of the control panel to “boiler normal” ifthe boiler is to be shut down each night. Set it to “24-hour duty” if theboiler is to remain on continuously 24 hours per day (except duringblowdown).Set the tabs on the large timer for the ON <strong>and</strong> OFF times desiredfor the boiler, screw in the small black day-skip tabs if the boiler is toremain off for the weekend, etc.If the boiler is on 24-hour duty set the OFF tab for the time that isdesired for blowdown. The ON tab can be ignored, but must remain ontimer.The small time delay relay controls the time that the drain valveremains open. Counterclockwise decreases, clockwise increases blowdowntime. Time must be adjusted by trial.Figure 16 – Typical Wiring for Automatic Blowdown System7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!