13.07.2015 Views

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TM 5-<strong>6115</strong>-631-14&PCHAPTER 6TEST AND INSPECTION AFTER REPAIRSection I. GENERAL REQUIREMENTS6-1. General Requirements. The activity performing the repair is responsible for the performance ofall applicable tests and inspections specified in the technical manuals referenced below. Activitiesperforming maintenance on any component of the power plant must perform those tests and inspectionsrequired by the applicable component or system repair instruction.Section II. INSPECTION6-2. Generator Set Inspections.ing repair of the generator set.Refer to TM 5-<strong>6115</strong>-584-12 and --34 for inspections required follow-6-3. Trailer Inspections. Refer to TM 9-2330-213-14&P for inspections required following repair ofthe trailer.Section Ill. OPERATIONAL TESTS6.4. Generator Set Operational Tests. Refer to TM 5-<strong>6115</strong>-584-12 and – 34 for operational testsrequired to verify satisfactory performance of the generator set.6.5. Trailer Operational Tests. Refer to TM 9-2330-213-14&P for operational tests required to verifysatisfactory performance of the trailer.6-1/(6-2 blank)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!