13.07.2015 Views

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TM 5-<strong>6115</strong>-631-14&PWARNINGWhen lifting trailer body, use lifting equipment with a minimum lifting capacityof 15<strong>00</strong> lb. Do not stand under trailer body while it is being lifted. Failure toobserve these precautions can cause injury to personnel or damage toequipment.(14) Using lifting equipment with a minimum lifting capacity of 15<strong>00</strong> lb, lift trailer body (13)off trailer frame (22).b. Repair. Repair of the trailer bed and fenders is limited to replacement of footmans loops andstraightening, welding, and repainting bed and fender weldment. If required, repaint in accordancewith MIL-T-704, Type F or G, as applicable, color Green, No. 383 of MIL-C-46168. There is onefootmans loop mounted to the top of each fender. Replace footmans loop as follows:(1) Remove two screws (29), two flat washers (30) and two self-locking nuts (31) securingfootmans loop (32) to fender and take off footmans loop.(2) Position new footmans loop (32) on fender and secure with two screws (29), two flatwashers (30) and two self-locking nuts (31).c. Installation.WARNINGWhen lifting trailer body, use lifting equipment with a minimum lifting capacityof 15<strong>00</strong> lb. Do not stand under trailer body while it is being lifted. Failure toobserve these precautions can cause injury to personnel or damage toequipment.(1)Using lifting equipment with a minimum lifting capacity of 15<strong>00</strong> lb, lift trailer body (13)onto trailer frame (22) and aline mounting holes.NOTEThere are 12 short screws and four long screws, securing trailer body to trailerframe. Since corner screws must extend through trailer chassis rails, cornermounting locations require longer screws (step (2)).(2)(3)(4)(5)(6)Working on top of trailer body, insert four long screws (26) with one flat washer (27) eachthrough trailer body (13) and trailer frame (22) rails at corner mounting locations.Insert 12 screws (23) with one flat washer (24) each through trailer body (13) and rails oftrailer frame (22).Working under trailer, install one flat washer (24 and 27) and one nut (25 and 28) oneach of 16 screws installed in steps (2) and (3). Tighten hardware to secure trailer body(13) to trailer frame (22).Install and tighten two screws (18) and two flat washers (19) securing each of two fronttrailer body support brackets (21) to trailer frame (22).Install and tighten 12 screws (18), 24 flat washers (19) and 12 nuts (20) securingremaining trailer body support brackets (21) to trailer frame (22).5-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!