13.07.2015 Views

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TM 5-<strong>6115</strong>-631-14&PNOTEObserve identification tags when installing internal wires.(d) Slide Iockwasher (10) and terminal lug(s) of wire(s) (9) onto stud (8).(e) Install Iockwasher (7) and nut (6) on terminal (8) and tighten against wire terminal lug.(f) Position cover (4) on switch box (5) and secure with 16 screws (1), 16 Iockwashers (2)and 16 flat washers (3).Figure 4-10. Load Terminal Replacement.b. Indicator Light and Wire Assembly Repair and Replacement. (See figure 4-11.) There are twoindicator light and wire assemblies on the switch box. This procedure is typical for both. When attachingwires, refer to the schematic inside the switch box (figure 4-7 or 4-8, as applicable). The indicatorlight and wire assembly is repaired by replacing defective terminals or soldering broken wires.Soldering shall be done in accordance with TB SIG 222.(1) Removal.(a) Remove 16 screws (1, figure 4-11), 16 Iockwashers (2) and 16 flat washers (3)securing cover (4) to switch box (5) and take cover off switch box.(b) Remove screw (6), nut (7) and star washer (8) attaching each indicator light wire terminal(9) to its respective switch terminal (10). Take power cable wire (11) and indicatorlight wire (12) off switch terminal.4-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!