13.07.2015 Views

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

nsn 6115-00-033-1395 - Igor Chudov

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TM 5-<strong>6115</strong>-631-14&PFigure 4-3. External Fuel Line Connection.Section Il. MOVEMENT TO A NEW WORKSITE4-3. Dismantling for Movement. Because the power plant is designed to be mobile, a minimumamount of effort is required to relocate to a new worksite. Procedures are as follows:a.b.c.d.e.f.9.h.Disconnect power plant from system or equipment being powered.Disconnect ground cable from source of ground and from power plant GROUND TERMINALstud. Roll up cable and store in accessory box.Using slide hammer, remove ground rod. Disassemble, clean, and stow ground rod inaccessory box.Disconnect power plant from external fuel sources, if applicable.Stow any remaining authorized equipment in accessory box.Secure fire extinguishers and fuel cans in their respective mounting brackets.Lower and secure fitted cover in place on power plant.Remove locking pin from leg prop assembly on rear of trailer. Swing leg prop back and upinto traveling position and secure with pin.4-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!